openPR Logo
Press release

Latin America Data Center Market: Nearly 2 Million Sq. Ft. of Space and 536 MW of Regional Capacity by 2031 - Arizton

08-14-2026 03:27 PM CET | IT, New Media & Software

Press release from: Arizton Advisory & Intelligence

Latin America Data Center Market: Nearly 2 Million Sq. Ft.

Latin America's data center market is entering a period of significant capacity expansion, with the market expected to reach 2.13 million square feet by 2031, growing at a CAGR of 5.56%. By power capacity, the market is projected to reach 536 MW by 2031, registering a CAGR of 9.67%.
According to Arizton, the Latin America data center market witnessed USD 11.11 billion in investments in 2025 and is expected to reach USD 17.63 billion by 2031, growing at a CAGR of 8.01% during the forecast period.
Across Brazil, Mexico, Chile, Colombia, Argentina, and Peru, the outlook varies significantly in both projected capacity and construction economics. Brazil and Mexico lead by projected capacity, while Peru, Colombia, and Argentina have comparatively lower estimated construction costs. Chile combines a substantial capacity outlook with higher construction costs.

Dive Into the Data Behind the Growth Story → https://www.arizton.com/market-reports/latin-america-data-center-market-analysis

Brazil Sets the Regional Capacity Benchmark
Brazil is projected to host more than 780,000 square feet of data center space and over 195 MW of power capacity by 2031, giving it the largest projected footprint among the six markets.
The cost of developing data centers in Brazil ranges between $8.50 and $9.50 per watt. A renewable-heavy grid and a digital market large enough to support hyperscale development add to the country's attractiveness for large-scale data center projects.
With more than 190 MW of projected capacity, Brazil stands apart from the other markets in terms of development scale. The next consideration is how quickly the infrastructure required for this pipeline can be delivered, particularly across land, power, connectivity, and interconnection requirements.

Brazil: Explore the Capacity & Infrastructure Outlook →https://www.arizton.com/market-reports/brazil-data-center-market-investment-analysis-report-2025

Colombia Builds from a Competitive Cost Base
Colombia is projected to reach more than 230,000 square feet of data center space and 59 MW of power demand by 2031.
Construction costs were estimated at approximately $7-$8 million per MW in 2025, providing a comparatively competitive development cost within the six-country market.
At the same time, supply-chain friction, inflation, and rising interest rates are expected to place upward pressure on construction costs.
This gives Colombia a distinct position in the regional market: a growing capacity pipeline combined with a construction cost base that remains below several of the larger markets.

Colombia: Explore the Growth & Cost Outlook →https://www.arizton.com/market-reports/colombia-data-center-market

Mexico's Data Center Demand Gains from Nearshoring
Mexico is projected to reach approximately 502,000 square feet of data center space and 132 MW of power demand by 2031, making it the second-largest projected capacity market after Brazil.
The country's data center expansion is closely connected to nearshoring. As global supply chains increasingly realign toward North America, Mexico's digital infrastructure requirements are expanding alongside its industrial base.
The market is also associated with a relatively high construction cost range of approximately $10-$13 per watt, according to the original market comparison.
Mexico therefore combines one of the region's largest projected capacity requirements with a higher construction cost environment.

Mexico: See the Nearshoring & Data Center Outlook →https://www.arizton.com/market-reports/mexico-data-center-market-investment-analysis

Chile Combines Significant Capacity with Higher Construction Costs
Chile is projected to reach approximately 344,000 square feet of data center space and 82 MW of power demand by 2031.
Turner & Townsend's 2025 Data Center Cost Index places construction costs in Santiago at approximately $8.61 per watt, with inflation, supply-chain pressures, and interest rates expected to contribute to further increases.
Despite the higher construction cost, Chile remains a significant data center market in the regional outlook. Its projected capacity is substantially higher than that of Colombia, Argentina, and Peru.
The market therefore presents a different combination of higher construction costs and significant projected capacity.

Chile: Explore the Capacity & Cost Outlook → https://www.arizton.com/market-reports/chile-data-center-market

Argentina Develops from a Smaller Capacity Base
Argentina is projected to reach approximately 75,000 square feet of data center space and 18 MW of power demand by 2031.
Construction costs are estimated at approximately $7-$8 million per MW, placing Argentina within the lower cost range among the six markets.
Its projected footprint remains considerably smaller than those of Brazil, Mexico, Chile, and Colombia. However, the country's lower projected capacity is accompanied by comparatively competitive construction economics.
Argentina consequently occupies a different position within the regional outlook, with development taking place from a smaller capacity base.

Argentina: Explore the Capacity & Development Outlook →https://www.arizton.com/market-reports/argentina-data-center-market

Peru Stands Out on Construction Cost
Peru is projected to reach approximately 58,000 square feet of data center space and 15 MW of power demand by 2031.
Construction costs are estimated at approximately $6.5-$7.5 million per MW, the lowest range among the six markets in the original comparison.
The projected capacity is modest relative to Brazil, Mexico, and Chile, but the cost difference gives Peru a distinct position in the regional data center landscape.
Peru's combination of lower estimated construction costs and a developing capacity base makes it one of the more differentiated markets in the six-country comparison.

Peru: Explore the Cost & Capacity Outlook → https://www.arizton.com/market-reports/peru-data-center-market

Six Markets, Different Capacity and Cost Profiles
The six markets present markedly different development profiles:
• Brazil: More than 780,000 square feet and 195+ MW by 2031; construction costs of approximately $8.50-$9.50 per watt.
• Mexico: Approximately 502,000 square feet and 132 MW; construction costs of around $10-$13 per watt.
• Chile: Approximately 344,000 square feet and 82 MW; Santiago construction costs of approximately $8.61 per watt.
• Colombia: More than 230,000 square feet and 59 MW; construction costs of approximately $7-$8 million per MW.
• Argentina: Approximately 75,000 square feet and 18 MW; construction costs of around $7-$8 million per MW.
• Peru: Approximately 58,000 square feet and 15 MW; construction costs of approximately $6.5-$7.5 million per MW.

The figures point to a regional market where capacity scale and construction economics differ substantially by country. Brazil and Mexico carry the largest projected capacity requirements, while Peru, Colombia, and Argentina have comparatively lower construction-cost estimates. Chile combines a sizeable projected capacity with higher construction costs.

To Know More, Click: https://www.arizton.com/market-reports/latin-america-data-center-market-analysis

What the Six Markets Reveal
The six markets show that Latin America's data center growth is taking different forms across countries. Brazil and Mexico stand out for their larger projected capacity, while Chile combines strong capacity with higher construction costs. Colombia, Argentina, and Peru have smaller projected capacity but lower estimated construction costs.
This shows that capacity growth and construction costs are not the same across the region. Each market has a different balance between how much data center space is expected to be added and what it may cost to build that capacity.
The six countries therefore offer different market conditions, with both capacity and construction costs shaping their position in Latin America's data center market.

Explore the Six Country Data Center Markets: https://www.arizton.com/market-reports/category/flt1--dckb-investment-analysis-latin-america
Brazil | Mexico | Chile | Colombia | Argentina | Peru

Contact Us
Mail: enquiry@arizton.com
Contact Us: https://www.arizton.com/contact-us

About Us:
Founded in 2017, Arizton Advisory & Intelligence delivers data-driven market research and strategic consulting that empowers clients to make informed decisions and drive growth. Combining quantitative and qualitative insights, we provide in-depth analysis across industries including Agriculture, Consumer Goods, Technology, Automotive, Healthcare, Data Centers, and Logistics. Recognized by top-tier media, our expert team transforms complex market data into actionable strategies, helping clients anticipate trends, seize opportunities, and stay ahead of the competition.

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release Latin America Data Center Market: Nearly 2 Million Sq. Ft. of Space and 536 MW of Regional Capacity by 2031 - Arizton here

News-ID: 4604244 • Views:

More Releases from Arizton Advisory & Intelligence

Global Data Center Market to Reach USD 959.19 Billion by 2031: Investment Trends, Power Capacity, and Regional Growth Outlook, 2026-2031 - Arizton
Global Data Center Market to Reach USD 959.19 Billion by 2031: Investment Trends …
Global data center investment exceeded USD 514.26 billion in 2025, up around 35.22% from 2024. But the more significant shift is taking place in the scale and infrastructure requirements of new capacity. Hyperscale and AI deployments are pushing facilities toward 100-500 MW and beyond, while higher rack densities are changing power and cooling requirements. At the same time, investment is expanding across established and emerging markets, creating a broader development
Who's Winning the $1.43B U.S. Glamping Market? Under Canvas, AutoCamp, KOA & Collective Retreats Revealed - Arizton
Who's Winning the $1.43B U.S. Glamping Market? Under Canvas, AutoCamp, KOA & Col …
The U.S. glamping market is moving into a more competitive phase. The U.S. glamping market size was valued at USD 746.75 million in 2025 and is expected to reach USD 1.43 billion by 2031, growing at a CAGR of 11.49% during the forecast period. The market is experiencing growth, driven by several factors, including the shift towards year-round and permanent structures, along with digital discovery and AI visibility, which are
Five Reasons Coconut Water Is Winning the Beverage Aisle - Exclusive Insights by Arizton
Five Reasons Coconut Water Is Winning the Beverage Aisle - Exclusive Insights by …
Sugar Taxes and Sweaty Gym Selfies Are Rewriting the Beverage Aisle Walk down any US grocery aisle today and the beverage cooler tells a story: sugary soda facings are shrinking while coconut water cartons and cans keep multiplying. This isn't a passing wellness fad - it's the visible edge of a much bigger shift in how consumers think about hydration, health, and what goes into their bodies. Understanding why demand keeps
Maternity Apparel Market: Consumers Prioritize Comfort, Longer Use and Value as Industry Heads Toward USD 8.45 Billion by 2031 - Arizton
Maternity Apparel Market: Consumers Prioritize Comfort, Longer Use and Value as …
The global maternity apparel market was valued at USD 7.23 billion in 2025 and is expected to reach USD 8.45 billion by 2031, growing at a CAGR of 2.62% during the forecast period. Consumer preferences within the maternity apparel market are changing, with greater attention to comfort, fit, functionality, and style. Rising female workforce participation, fashion awareness, and e-commerce adoption are also supporting demand. Growth is expected to vary across regions

All 5 Releases


More Releases for Brazil

Tupavest Announces "Brazil-First" Trust and Localization Roadmap for Digital Ass …
Company unveils a six-month plan focused on Portuguese-language education, clear user communication, and an "architecture-based trust" approach for Brazil's digital asset community. São Paulo, Brazil - June 26, 2026 - Tupavest, a next-generation digital asset platform built on the principle of "trust by architecture," today announced its "Brazil-First" roadmap. The initiative focuses on Portuguese-language education, transparent user communication, and a localized approach designed specifically for Brazil's digital asset users. The roadmap
Brazil Clinical Trials Market ANVISA Brazil Guidelines Brazil Clinical Trials Re …
Brazil Cancer Drugs Clinical Trials Insight 2024 Report Offering: • Brazil Clinical Trials Market Opportunity 2024 and 2030 (In US$ Billion) • Clinical Trials Regulatory Framework In Brazil • Total Number of Cancer Drugs In Clinical Trials In Brazil • Total Number Of Cancer Drugs Approved In Brazil • 400 Pages Clinical Trials Insight On All Cancer Drugs In Clinical Trials By Company, Indication and Phase • 80 Pages Clinical Insight On All Cancer Drugs Approved in Market By Company and Indication • Insight
ATM Machine Market is Booming (18% CAGR)| NCR Brazil, Diebold Brazil, Wincor Nix …
HTF MI recently introduced ATM Machine Market study with in-depth overview, describing about the Product / Industry Scope and elaborates market outlook and status to 2023. The market Study is segmented by key regions which is accelerating the marketization. At present, the market is developing its presence and some of the key players from the complete study are Itautec S/A, NCR Brazil, Diebold Brazil, Wincor Nixdorf Brazil,
Brazil: Country Intelligence Report 2018 By Claro, Sky Brazil, Oi, Vivo, TIM Bra …
"Brazil: Country Intelligence Report", by GlobalData provides an executive-level overview of the telecommunications market in Brazil today, with detailed forecasts of key indicators up to 2021. Published annually, the report provides detailed analysis of the near-term opportunities, competitive dynamics and evolution of demand by service type and technology/platform across the fixed telephony, broadband, and mobile, as well as a review of key regulatory trends.
Agrochemicals Market in Brazil
ReportsWorldwide has announced the addition of a new report title Brazil: Agrochemicals: Market Intelligence (2016-2021) to its growing collection of premium market research reports. The report “Brazil: Agrochemicals: Market Intelligence (2016-2021)” provides market intelligence on the different market segments, based on type, active ingredient, formulation, crop, and pest. Market size and forecast (2016-2021) has been provided in terms of both, value (000 USD) and volume (000 KG) in the report. A
ATM Machine Market in Brazil 2015-2019: Competitive analysis of key vendors, inc …
Albany, NY, Feb 23, 2017: This report segments the ATM machine market in Brazil by revenue generated and the unit shipment. It also includes the competitive analysis of key vendors, including Itautec S/A, NCR Brazil, Diebold Brazil and Wincor Nixdorf Brazil. Market scope of the ATM machine market in Brazil Technavios market research analyst predict that the ATM machine market in Brazil will continue to grow at CAGR of 18.72%. The key