openPR Logo
Press release

Two new LORENTZ solar parks in Spain

02-21-2008 04:27 PM CET | Energy & Environment

Press release from: Bernt Lorentz GmbH & Co. KG

/ PR Agency: STOYKE.COM
The LORENTZ solar park in Badajoz is equipped with 520 units ETATRACK active 1500SP. It has taken up operation in two subsequent phases in July and October 2007. 1.1MWp are now fed into the local electricity network.

The LORENTZ solar park in Badajoz is equipped with 520 units ETATRACK active 1500SP. It has taken up operation in two subsequent phases in July and October 2007. 1.1MWp are now fed into the local electricity network.

LORENTZ has managed to upvalue its position in the Spanish solar market. The company supplies solar tracking systems for two middle-sized solar parks, once near the city of Badajoz in the region of Extremadura, 1.1MWp in size, the other near Cambil in Andalusia, sized 2.1MWp.

The park in Badajoz is equipped with 520 units ETATRACK active 1500SP. It has taken up operation in two subsequent phases in July and October 2007. 1.1MWp are now fed into the local electricity network. Multistage growth has been made possible through the flexible control concept of LORENTZ. LORENTZ's central control unit is able to manage up to 2,000 tracking units.

Delivery and installation was performed in close cooperation of one of LORENTZ's distributors and local installation teams. LORENTZ trained service staff in the region to ensure smooth operation. "The cooperation with our local partners couldn't be any better," says Oliver Nave, vice general manager of LORENTZ. "In consequence, we can guarantee quick and trouble-free maintenance. Breakdowns are avoided."

Another park, close to Cambil in Andalusia, will start operation in early summer 2008. It will provide approx. 2.1MWp and will be equipped with 912 tracking units ETATRACK active 1800SP. This tracker is new in the LORENTZ range. It has been specially fitted to the customer's needs.

LORENTZ's single-axis tracking systems are in operation worldwide. They are sturdy and maintenance-free and have proven their reliability in all climate zones, such as they typhoon-ridden areas of South Korea. They can be used in off grid installations as well as in net-connected services.

Contact
Oliver Nave, Vice GM
oliver.nave@lorentz.de

LORENTZ
Heidekoppel 16
24558 Henstedt-Ulzburg
Germany

www.lorentz.de

LORENTZ in Germany

Since more than a decade, LORENTZ successfully produces solar pump systems and solar tracking systems. In R&D, LORENTZ pays special attention to the maintenance-free long-term service of its products. The success of this concept is proven by the daily performance of LORENTZ pumps and trackers in more than 100 countries all over the globe.

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release Two new LORENTZ solar parks in Spain here

News-ID: 38036 • Views:

More Releases from Bernt Lorentz GmbH & Co. KG

LORENTZ delivers 750 tracking systems
LORENTZ delivers 750 tracking systems for an 8-hectar solar park in Oberruesselsbach close to Nuremberg in Southern Germany. The plant renders 1.7MW and hereby is the largest tracked solar power plant in the region of Northern Bavaria. This delivery is part of the “PV Package” of Krinner, partner of LORENTZ. The PV Package includes the delivery and installation of Krinner’s screw foundations, the LORENTZ tracking systems and the installation of the
LORENTZ successfully introduces ETATRACK tracking system to South Korea
LORENTZ successfully introduces ETATRACK tracking system to South Korea
In Kwang Yang a 100 kWp solar park has been connected to the grid LORENTZ newest park is located in the South of South Korea (ca. 35° N). It con-sists of 44 ETATRACK active 1500 track-ing units, each equipped with twelve Sanyo 190Wp HIP solar modules. The total size of the park is 100kWp. ETATRACK active 1500 with its ex-tremely robust design and medium-sized module surface is especially suitable for the
Not afraid of the winter with LORENTZ tracking systems
Not afraid of the winter with LORENTZ tracking systems
Since the recent enormous snow falls in Bavaria this February many operators of solar installations wonder how much weight the mounting of their modules can safely endure. Extreme weather conditions like these might be occur more often in the near future. Snow weights of up to 250 kg/m2 are a severe test for solar tracking systems in particular. A sensor-guided solar tracker might drive into horizontal "sleeping" position when its sensor
Lorentz delivers 60 pump systems for a UNDP project in Panama
Lorentz delivers 60 pump systems for a UNDP project in Panama
LORENTZ, a German manufacturer of solar-operated pumps and solar tracking systems, and its Panama partner PASS, S.A., have been commissioned to deliver and install 60 pump systems in Panama. The installation will take place by end of April 2006. The President of Panama, Martín Torrijos, handed over the order to Mr Vicente Puga, CEO of PASS, last week. The pump systems PS200 HR-07 will pump water from 25 m deep wells.

All 5 Releases