openPR Logo
Press release

First Class Ventilation, Heating and Cooling Services for New Liverpool Arena and Convention Centre

06-01-2007 03:00 PM CET | Industry, Real Estate & Construction

Press release from: Senior Hargreaves

/ PR Agency: Ainsworth Maguire
First Class Ventilation, Heating and Cooling Services for New

To ensure a high quality and comfortable internal environment in the new Liverpool Arena and Convention Centre, ductwork for ventilation, heating and cooling services will be provided by specialist, Senior Hargreaves. The work falls under a contract from Haden Young who have overall responsibility for the Centre’s electrical, mechanical and public health services installation and commissioning. The new development will be a cornerstone of the City of Culture celebrations in 2008 and is part of a major regeneration initiative.

The Liverpool development benefits from Hargreaves HVAC experience with similar world-class venues. These include the International Conference Centre and MEN Arena in Manchester, the International Conference Centre, Arena and Symphony Hall at Birmingham, Wimbledon Number One Court, Bolton’s Reebok Stadium and extensive works at Manchester United’s Old Trafford Stadium.

In keeping with the prestigious location, next to the Grade 1 listed Albert Dock and the Three Graces (a World Heritage site), the city of Liverpool sought an outstanding architectural design. Award winning architects Wilkinson Eyre have created a complex that combines a 9,500 seat multi-purpose arena for concerts and sports along with a 1,350 seat auditorium and an exhibition space of 7000 square metres. The two wings of the development are linked by a central galleria that provides access to all major facilities, a variety of hospitality and catering services and a through pedestrian route to the riverside.

Flexibility for different events and levels of occupancy is a key element in the building services, designed by consultants Faber Maunsell. This in turn, is part of the energy conservation strategy for the building that matches rates of airflow, heating or cooling to the occupancy demand.

Engineers faced several challenges in meeting the exacting environmental standards and demands for flexibility. In addition to the variable cooling, heating and comfort demands, care has been taken to avoid harsh airflow. All critical systems are suitably attenuated to avoid the transmission of fan noise or vibration.

Kitchens and catering concessions posed potential fire hazards and so the exhaust ventilation systems from these are made from Hargreaves tested HFD fire resistant ductwork. These insulated ducts effectively contain the dangerous products of combustion. In the event of fire, break-out from these ducts is avoided and the products of combustion are safely discharged to outside of the building. Fire dampers will isolate the general ventilation system in the event of fire and interlinks will switch off the fans that are normally used for everyday comfort control.

Large plant rooms are commonplace in such heavily serviced buildings. This has been overcome by distributing these facilities to open roof decks on the flanks of the building. There are four of these areas that are screened off from street level.

Logistics and access also tested Hargreaves ingenuity. The programme schedule has required close coordination between the Bury factory, fitters on site and the transport team. Equipment has been manufactured, delivered to site and installed within tight time frames. The wide-span roof, up to 23 metres above the arena floor, meant using high-level scaffolding and mechanical access for both men and material. Skilled fitting teams then had to optimise the pathway for the ductwork through the complex roof truss matrix.

The principal contractor for the development is Bovis Lend Lease. Completion is expected in 2007 in readiness for the 2008 celebrations.

More Information
Phil Johnson, Senior Hargreaves, Tel. 0161 764 5082 Fax. 0161 762 2336
E-mail: phil.johnson@senior-hargreaves.co.uk Web: hargreaves-ductwork.co.uk
Senior Hargreaves, Lord Street, Bury, Lancashire BL9 0RG, UK

High/low resolution images are on the web at ainsmag.co.uk/ha166/4152ha1a.htm

Senior Hargreaves is the UK's largest ductwork manufacturer. From their 250,000 square foot factory in Bury, Manchester, they produce over 4,000 tonnes of HVAC ductwork each year. The HFD range of fully tested fire resistant ductwork constructions is designed for smoke ventilation in fire engineering projects.

Phil Johnson, Senior Hargreaves, Tel. 0161 764 5082 Fax. 0161 762 2336
E-mail: phil.johnson@senior-hargreaves.co.uk Web: www.hargreaves-ductwork.co.uk
Senior Hargreaves, Lord Street, Bury, Lancashire BL9 0RG, UK

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release First Class Ventilation, Heating and Cooling Services for New Liverpool Arena and Convention Centre here

News-ID: 21485 • Views: 996

More Releases from Senior Hargreaves

Ventilation Ductwork Engineering Specialist Senior Hargreaves Opens New Southern …
HVAC ductwork manufacturer and contractor Senior Hargreaves has opened a new project office at Calleva Park in Reading. Headed up by business development manager Gary Parslow the new facility will house project management and other technical support staff for rapid response to client needs. This means even better local service for architects, building services specifiers and construction clients in the South of England. Hargreaves CEO, Tim Hopkinson commented, “We
Heating and Ventilation Ductwork Experts Hargreaves Appoint New Business Develop …
Construction industry veteran Gary Parslow has joined the team at heating and ventilation specialist Senior Hargreaves. As business development manger he brings in-depth experience to the company at a critical time in the businesses development. Gary has 32 years experience in the heating, ventilation and air-conditioning industry, most recently as a director at Isotemp, the specialist South Wales ventilation ductwork contractor. Previous projects for which he was
Ventilation Ductwork Specialist Senior Hargreaves Has New Chief Executive
Tim Hopkinson, the new chief executive at ventilation ductwork specialist Senior Hargreaves, is adopting a business as usual approach as he takes over from former managing director, Kevin White. Tim is keen to build on the knowledge and experience in the business that has given Hargreaves a solid foundation in the currently turbulent construction market. Tim joins Hargreaves from a construction and building services background. His career journey, from
Top Changes at Ventilation Ductwork Experts Hargreaves
The managing director at ductwork specialist Senior Hargreaves, Kevin White, has retired after 40 years with the business. “I have seen some huge changes in the business over the years,” he says, citing the emergence of the trade counter business, Ductshops, the development of Hargreaves HFD fire resistant ductwork and the creation of a new a division devoted to new products and innovations. Kevin joined the company as an

All 5 Releases


More Releases for Centre

Sydney CBD Medical Centre
Our mission is to provide the highest standard care to you and your family. We are committed to promote well being and disease prevention. We pride ourselves on our services and our doctors are continually pursuing excellence in medicine and surgery through their work and study. This is a fully accredited medical centre under the standards set by the Royal Australian College of General Practitioners and also NSW Health Dept
Dartford Road Dental Centre
Dartford Road Dental Centre – dentist in Dartford Dartford Road Dental Centre is a dentist in the heart of Dartford and provides great dental care to patients from Dartford and the surrounding area. The dental practice opened in the 1980s and prides itself on providing award-winning dental care at affordable prices. The aim of Dartford Road Dental Centre is to provide good quality, up to date dental care in a caring and
Incentivising Contact Centre Teams
The establishment of incentives is an important process for every contact centre, and the KPI’s are typically aligned with the overall corporate strategy and mission. How KPI’s are set, will in part be determined by the type of contact centre i.e. sales, service or support, and the indicators will consider customer satisfaction, operational efficiency, sales, and agent quality for example. Choosing the measurements for success and the subsequent rewards also
Smilecare Dental Centre
The Smilecare Dental Centre in Crawley has been established since 1961. In fact, the practice was one of the first purpose-built dental centres in the UK. There have been many upgrades to the facilities since then, and this has culminated into the modern, inviting and high-tech facilities and environment that we see in the practice today. They are very much seen as a family dentist and have been looking after people’s
Viva Business centre Assignment
Viva Ball Centre, which is a sport convention that provides football pitches available for hire for both adults and juniors on an hourly basis and available 17 hours daily 7 days a week, the prices will be between 25-55£ per hour depends on the time slots chosen (higher prices will be in weekends, peak hours). The centre will provide six 6-a side pitches. The pitches are equal and located
Centre for Healthcare Technology
Opening with Premier McAllister The ZHT Centre for Healthcare Technology of the PFH Private University of Göttingen combines orthopaedic expertise with scientific competence. It is a unique facility in the world and its goal is to raise the quality of patient care to a new level. The facility was officially opened on Monday, March 19, 2012, by the President of the PFH, Professor Dr. Bernt Sierke. Premier of Lower Saxony David McAllister,