openPR Logo
Press release

First Class Ventilation, Heating and Cooling Services for New Liverpool Arena and Convention Centre

06-01-2007 03:00 PM CET | Industry, Real Estate & Construction

Press release from: Senior Hargreaves

/ PR Agency: Ainsworth Maguire
First Class Ventilation, Heating and Cooling Services for New

To ensure a high quality and comfortable internal environment in the new Liverpool Arena and Convention Centre, ductwork for ventilation, heating and cooling services will be provided by specialist, Senior Hargreaves. The work falls under a contract from Haden Young who have overall responsibility for the Centre’s electrical, mechanical and public health services installation and commissioning. The new development will be a cornerstone of the City of Culture celebrations in 2008 and is part of a major regeneration initiative.

The Liverpool development benefits from Hargreaves HVAC experience with similar world-class venues. These include the International Conference Centre and MEN Arena in Manchester, the International Conference Centre, Arena and Symphony Hall at Birmingham, Wimbledon Number One Court, Bolton’s Reebok Stadium and extensive works at Manchester United’s Old Trafford Stadium.

In keeping with the prestigious location, next to the Grade 1 listed Albert Dock and the Three Graces (a World Heritage site), the city of Liverpool sought an outstanding architectural design. Award winning architects Wilkinson Eyre have created a complex that combines a 9,500 seat multi-purpose arena for concerts and sports along with a 1,350 seat auditorium and an exhibition space of 7000 square metres. The two wings of the development are linked by a central galleria that provides access to all major facilities, a variety of hospitality and catering services and a through pedestrian route to the riverside.

Flexibility for different events and levels of occupancy is a key element in the building services, designed by consultants Faber Maunsell. This in turn, is part of the energy conservation strategy for the building that matches rates of airflow, heating or cooling to the occupancy demand.

Engineers faced several challenges in meeting the exacting environmental standards and demands for flexibility. In addition to the variable cooling, heating and comfort demands, care has been taken to avoid harsh airflow. All critical systems are suitably attenuated to avoid the transmission of fan noise or vibration.

Kitchens and catering concessions posed potential fire hazards and so the exhaust ventilation systems from these are made from Hargreaves tested HFD fire resistant ductwork. These insulated ducts effectively contain the dangerous products of combustion. In the event of fire, break-out from these ducts is avoided and the products of combustion are safely discharged to outside of the building. Fire dampers will isolate the general ventilation system in the event of fire and interlinks will switch off the fans that are normally used for everyday comfort control.

Large plant rooms are commonplace in such heavily serviced buildings. This has been overcome by distributing these facilities to open roof decks on the flanks of the building. There are four of these areas that are screened off from street level.

Logistics and access also tested Hargreaves ingenuity. The programme schedule has required close coordination between the Bury factory, fitters on site and the transport team. Equipment has been manufactured, delivered to site and installed within tight time frames. The wide-span roof, up to 23 metres above the arena floor, meant using high-level scaffolding and mechanical access for both men and material. Skilled fitting teams then had to optimise the pathway for the ductwork through the complex roof truss matrix.

The principal contractor for the development is Bovis Lend Lease. Completion is expected in 2007 in readiness for the 2008 celebrations.

More Information
Phil Johnson, Senior Hargreaves, Tel. 0161 764 5082 Fax. 0161 762 2336
E-mail: phil.johnson@senior-hargreaves.co.uk Web: hargreaves-ductwork.co.uk
Senior Hargreaves, Lord Street, Bury, Lancashire BL9 0RG, UK

High/low resolution images are on the web at ainsmag.co.uk/ha166/4152ha1a.htm

Senior Hargreaves is the UK's largest ductwork manufacturer. From their 250,000 square foot factory in Bury, Manchester, they produce over 4,000 tonnes of HVAC ductwork each year. The HFD range of fully tested fire resistant ductwork constructions is designed for smoke ventilation in fire engineering projects.

Phil Johnson, Senior Hargreaves, Tel. 0161 764 5082 Fax. 0161 762 2336
E-mail: phil.johnson@senior-hargreaves.co.uk Web: www.hargreaves-ductwork.co.uk
Senior Hargreaves, Lord Street, Bury, Lancashire BL9 0RG, UK

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release First Class Ventilation, Heating and Cooling Services for New Liverpool Arena and Convention Centre here

News-ID: 21485 • Views:

More Releases from Senior Hargreaves

Ventilation Ductwork Engineering Specialist Senior Hargreaves Opens New Southern Project Office
Ventilation Ductwork Engineering Specialist Senior Hargreaves Opens New Southern …
HVAC ductwork manufacturer and contractor Senior Hargreaves has opened a new project office at Calleva Park in Reading. Headed up by business development manager Gary Parslow the new facility will house project management and other technical support staff for rapid response to client needs. This means even better local service for architects, building services specifiers and construction clients in the South of England. Hargreaves CEO, Tim Hopkinson commented, “We
Heating and Ventilation Ductwork Experts Hargreaves Appoint New Business Development Manager
Heating and Ventilation Ductwork Experts Hargreaves Appoint New Business Develop …
Construction industry veteran Gary Parslow has joined the team at heating and ventilation specialist Senior Hargreaves. As business development manger he brings in-depth experience to the company at a critical time in the businesses development. Gary has 32 years experience in the heating, ventilation and air-conditioning industry, most recently as a director at Isotemp, the specialist South Wales ventilation ductwork contractor. Previous projects for which he was
Ventilation Ductwork Specialist Senior Hargreaves Has New Chief Executive
Ventilation Ductwork Specialist Senior Hargreaves Has New Chief Executive
Tim Hopkinson, the new chief executive at ventilation ductwork specialist Senior Hargreaves, is adopting a business as usual approach as he takes over from former managing director, Kevin White. Tim is keen to build on the knowledge and experience in the business that has given Hargreaves a solid foundation in the currently turbulent construction market. Tim joins Hargreaves from a construction and building services background. His career journey, from
Top Changes at Ventilation Ductwork Experts Hargreaves
Top Changes at Ventilation Ductwork Experts Hargreaves
The managing director at ductwork specialist Senior Hargreaves, Kevin White, has retired after 40 years with the business. “I have seen some huge changes in the business over the years,” he says, citing the emergence of the trade counter business, Ductshops, the development of Hargreaves HFD fire resistant ductwork and the creation of a new a division devoted to new products and innovations. Kevin joined the company as an

All 5 Releases


More Releases for Centre

Data Centre Cooling
Data Centres just need to embrace innovation, and start thinking differently in terms of design - specifically for cooling infrastructure. Data Centres now need to become smarter, to not work harder, to achieve efficiency and sustainability goals for future generations. What they need, and this starts with planning, is to adopt a new design approach! By working with innovative businesses, that have created products and technologies which have been constructed with Energy
Turner Business Centre - A new business centre in Manchester
The Stephen Turner Interview Turner Business Centre is yet another recent achievement of Mr Stephen Turner, who bought the building in 2017 as part of the main group of companies, Associated Securities Group (ASG), of which he is MD. The warehouse element of the building houses stock and manufacturing equipment for ASG. The front part of the building lends itself as a two-storey Business Centre, which has been tastefully revamped; dragging it
Maharshi Atreya Health Centre - Well known Ayurvedic Health Centre in India
Maharshi Atreya Health Centre, well known Ayurvedic Hospital, in the outskirt of Vadodara city, Gujarat has completed 19 years of its operation. It was started by a visionary, best ayurvedic doctor with 50+ years of experience in the field of Ayurveda by Dr Dinesh Pandya. Dr Pandya has started a new Ayurvedic clinic, a branch of Maharshi Atreya Health Centre in heart of Vadodara city. “It is one of the best
Srushti Fertility Centre is a Leading IVF Centre in Chennai
Starting a family is a joy yet the journey to becoming parents isn’t always easy and straightforward. A plethora of infertility issues come in the way and prevent couples from converting their dream of having their bundle of joy. Having the requisite expertise in providing help to such couples, Srushti Fertility Centre is a distinguished provider of fertility-related treatments and services. Based in the city of Chennai, India, the fertility
Medical Tourism Global Market 2018: Key Players – Island Hospital, IJN Health …
This report studies the global market size of Medical Tourism in key regions like North America, Europe, Asia Pacific, Central & South America and Middle East & Africa, focuses on the consumption of Medical Tourism in these regions. This research report categorizes the global Medical Tourism market by players/brands, region, type and application. This report also studies the global market status, competition landscape, market share, growth rate, future trends, market drivers,
Flow Centre vs. Distribution Centre: Less Inventory, Faster Fulfilment
Traditional retailing seems no longer relevant to the current overview of the industry. Customers nowadays either do their shopping entirely online or buy the items online and pick them up in store. This means it’s time for the sellers to reinvent their supply chain management as well as the inventory fulfilment process.  Target introduces their new concept – “flow centre” As the competition between retailers to provide top-notch service and shopping experience to customers is growing,