PERI delivers an optimally adapted formwork and scaffolding solution for this new cultural complex.

PERI delivers an optimally adapted formwork and scaffolding solution for this new cultural complex.

May 2, 2011 | Parco della Musica e della Cultura, Florence, Italy

The complicated architecture of the new cultural complex calls for an optimal balance between the formwork and scaffolding to be used. In addition, the building contractor requires large quantities of materials due to the extremely tight construction period. PERI planned a cost-effective solution and supplies the system equipment on a just-in-time basis from the on-site rental park. Through the compatibility of the systems, the transfer of loads is optimized along with simplifying the execution of the building work and accelerating construction progress.

The new, unique "Parco della Musica e della Cultura" cultural building is located very close to the "Leopolda" railway station in Florenz. The challenge for the contractor here is that the building shell must be completed in only 18 months. The opening ceremony of the theatre is already planned for 21st December 2011 when the Indian honorary conductor, Zubin Metha, will conduct Beethoven´s Ninth Symphony. The short construction period requires tremendous utilisation of personnel: a team of around 300 workers is working in multiple shifts which also includes nights.

The opera house will have a seating capacity of 1,800 with the base area in an inclined position. A 40 m a high stage tower is also being realised which allows a fast change of scenery. The external walls of the building feature a special type of architecture with the design of the architectural concrete areas and distinctive openings characterizing the exterior appearance. A second concert hall for approx. 1,100 music lovers will be equipped with a centrally-positioned front stage. The tower for the stage technology and equipment reaches a height of 24 m.

Shoring and formwork from one source – optimally matched
In particular, the planning and supply of the complete solution from one source was the decisive criterion for the contractor in deciding to realise the project together with PERI. The PERI shoring solutions are completely compatible with the formwork systems which facilitate an optimized transfer of loads. Interface problems are therefore kept to an absolute minimum, errors in the execution are avoided and productivity is maximized. Furthermore, the formal way for the building contractor is far more simple as PERI also coordinates the static for both the shoring and formwork.

In addition, with its extensive rental equipment pool, PERI easily meets the requirement of being able to supply the large quantity of materials extremely quickly. Through renting the required system equipment over the period of actual use, material costs are accurately adapted to the needs and cost-effectiveness is increased. Materials to the value of around € 12 million are in use on the construction site. Apart from the technical advantages of the scaffolding and formwork systems, customised site solutions and planning services, PERI´s logistics operations in particular contribute to a successful project completion.

High demands on loads and geometry – solved with system components
The "Parco della Musica e della Cultura" project is technically extremely challenging and, among other things, the entrance foyer of the large opera house requires a complex execution solution. At a height of 20 m, this area has a 16 m cantilever over a total length of 46 m.

Centrally positioned in the opera house is the stage – around 15 m above this, the rectangular stage tower with its 120 cm thick walls climbs upwards. The technical equipment is installed on three sides of the tower while the fourth side is open to the auditorium whose ground plan is in the form of an ellipse. The audience seating arrangement as well as the slabs are not only inclined but also feature varying slab thicknesses – thus forming complex, curved formwork sections.

The massive structural components used give rise to very high temporary loads which have to be safely transferred. In addition, large room heights along with numerous wall and slab offsets result in high requirements being placed on the load-carrying construction regarding the geometrical adaptation. The PERI UP Rosett modular scaffold and MULTIPROP post shores – often connected with MRK frames to form the MULTIPROP system – carry high loads and can be easily adapted to suit each building requirement. The MULTIPROP system not only carry the MULTIFLEX slab formwork but also the wall formwork of the stage tower – this means the loads from a 6 m high beam with a width of 120 cm. The wall sections are self-supporting after the initial 6 m high concreting cycle; subsequently, further sections are then concreted until the tower has been completed.

For larger heights, in particular the entrance hall, PERI UP Rosett modular scaffolding is being used as working scaffold and shoring. Depending on height and load, standard applications with pre-defined units as well as individually configured shoring towers are utilised. With nodes positioned at every 50 cm, PERI UP Rosett offers optimal adjustment. If required, the scaffolding could be adjusted in width and depth in a 25-cm-grid through the use of 25 cm long ledgers. Moreover, the metric grid dimensions allow bay widths to be divided as required.

All walls are being constructed with the proven TRIO wall formwork with the formwork elements positioned on FB 180 folding platforms at larger heights. The all-purpose work and safety scaffolding reliably transfers the high wind and working operation loads into the structure. For single-sided concreting of the walls in the basements, the construction team is using SB brace frames.

The "Parco della Musica e della Cultura" facility
This gigantic building complex places the Tuscan capital at the head of the art and cultural scene of the country again. It includes an opera house with 1,800 seats, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000. Generously-sized free areas and boulevards as well as an underground car park with 700 parking bays supplement the complex.

Construction of the "Parco della Musica e della Cultura" is being carried out to celebrate the 150th anniversary of the unification of Italy: in 1861, the individual Italian states were united to form a kingdom. At that time, Florence played an important and influential role, and the city was the capital of new Italy from 1865 to 1871.

Contractor
Società Consortile parco della Musica a.r.l.
Field Service
PERI S.p.A. Basiano (MI), Italy

PERI Systems In Use
- PERI UP Rosett Shoring Tower
- MULTIPROP Slab prop
- PERI UP Rosett
- TRIO
- FB 180 Platform System
- MULTIPROP System

PERI was founded in 1969 and is today the leading provider of formwork and scaffolding systems. Along with the headquarters in Weissenhorn, Germany, the company has 48 international subsidiaries and 100 stock yards around the world. The company has over 5500 employees. 2010 revenues was 825 million Euros.

PERI GmbH
Editorial Office
P.O. Box 1264
89259 Weissenhorn
Germany

Phone: +49 (0) 7309.950-1180
Fax: +49 (0) 7309.951-1180
E-Mail: redaktion@peri.de
Web: www.peri.de

Re-prints are free of charge quoting "Source: PERI GmbH". Please send a copy to the PERI Editorial Office.

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release Formwork and scaffolding from one source for problem-free construction progress here

News-ID: 174154 • Views:

More Releases from PERI GmbH - Formwork, Scaffolding, Engineering

Formwork and scaffolding from one source for Berlin´s City Palace
Formwork and scaffolding from one source for Berlin´s City Palace
Sep 1, 2015 - "Humboldt Forum" City Palace, Berlin For the reconstruction of Berlin´s City Palace, PERI supplied cost-effective formwork and scaffolding solutions from one source. In addition to providing large quantities of wall, column and slab formwork with fast shuttering and moving times as well as flexibly used scaffolding materials, the on-site support provided by the PERI engineers ensured that all requirements could be fulfilled along with maintaining the tight
Construction time optimisation through comprehensive working safety and crane-independent climbing
Construction time optimisation through comprehensive working safety and crane-in …
Aug 3, 2015 - International Towers Sydney ITS, Barangaroo South, Sydney, Australia The new LPS climbing protection panel from PERI provides comprehensive working safety and saves valuable crane time thanks to the mobile climbing hydraulics. This has accelerated construction progress on the International Towers Sydney complex on Australia's east coast. With the ambitious Barangaroo Redevelopment Project, Sydney's city centre is being redefined in a westward direction. On the 22-hectare former container port
System-based project solution saves time and money
System-based project solution saves time and money
July 1, 2014 - Capitol Hill Station, Seattle, USA The formwork and scaffolding solution provided for the construction of the new subway station in Seattle was the result of competent engineering and a project-specific construction kit system. In addition to the widest possible use of rentable PERI system components, the optimized construction method in particular ensured significant time and cost savings. The length of Seattle´s metropolitan railway system (Light Rail) is currently
Formwork in every shape and dimension – even faster with the new CNC system
Formwork in every shape and dimension – even faster with the new CNC system
June 16, 2014 - Visions of architects take shape with PERI Planned, formed, concreted – it is actually hard to believe that this procedure could ever function trouble-free in some cases of present-day abstract concrete structures. In its pursuit of uniqueness, architecture is becoming more and more ambitious. Parallel to this, the requirements of construction companies are likewise increasing. PERI, however, is keeping pace with this trend: with individual formwork solutions,

All 5 Releases


More Releases for Musica

Carbon Fiber Violin Bows Market Size 2022, Growth Drivers, Challenges, Trends An …
Market Summary A newly published report titled "Carbon Fiber Violin Bows Market" by QY Research throws light on the industry dynamics and current and future trends that play a key role in determining the business expansion. The report also highlights the key driving factors and restraints that are impacting the growth. For a comprehensive understanding, the professionals have reviewed the regulatory scenario, market entry strategies, best industry practices, pricing strategy, technology
SOLO MUSICA has signed a longterm contract with 27-year-old cellist ESTELLE REVA …
Her first recording for the label, to be released in Spring 2017, distributed by Sony Music in Europe and by Naxos worldwide, will feature Cello solo works by J.S. Bach and their reflections in selected repertoire of contemporary composers. Estelle Revaz belongs to the leading cellists of her generation, received several important prizes and is performing worldwide with great success as a soloist and chambermusician, as well. Since 2015 Estelle
John Cabot University to Host John Cage Day on April 13th
JCU is proud to join in the worldwide celebrations of the centennial of composer John Cage’s birth by hosting John Cage Day on April 13th. In collaboration with the Department of History and Humanities, and as part of its 40th anniversary celebrations, John Cabot University has the honor of welcoming German violoncellist Ulrike Brand, a collaborator of John Cage, who commissioned the work One12 for the Quaderni Perugini di Musica
AV Music Morpher Gold 5.0 – Pronta la Versione Italiana
Siamo lieti di annunciare il rilascio del nuovo strumento music editor sul mercato. Music Morpher Gold 5.0 – è un pacchetto completo con nuove funzionalità come ad esempio la modalità Player, la funzione AV Easy DJ, i nuovi moduli di Morpher e Converter, e una innovativa interfaccia. Questo programma è stato tradotto anche in lingua Italiana per gli amanti della musica in Italia. In questo modo sarà più semplice anche utilizzare
The Mahler Chamber Orchestra participates in the first EU conference on the topi …
On 25 and 26 October, representatives of culture, business and politics come together at the University of Ferrara to discuss questions of cultural development and European identity in times of crisis. The conference will promote an exchange about how art and culture can survive the current economic crisis for the long term. The forum was created by the University of Ferrara and the CRUI Foundation (Conference of Italian University Rectors)
The Mahler Chamber Orchestra opens the season at its Italian residence in Ferrar …
BERLIN, 13 October 2009 – In October 2009, the Mahler Chamber Orchestra (MCO) travels to Ferrara for its annual series of season-opening concerts. This year, the autumn period is made up of three concerts, including a concert performance of Richard Wagner’s Tristan und Isolde with Waltraud Meier in the title role. Chamber music concerts are also planned in cooperation with the concert promoter Ferrara Musica and the Torrione Jazz Club