Bamtec Roll-Out Concrete Reinforcement Speeds Completion of Biosciences Incubator
Bamtec concrete reinforcement enabled floor plates to be constructed more quickly, with less reinforcement material.
A new research and development centre for bioscience, the Catalyst caters for start-ups and small businesses. It provides new businesses with the resources of larger companies and an environment that will stimulate research and facilitate commercialisation of new discoveries. The combined laboratory, office and meeting spaces are housed in The Incubator and Accelerator. There are also meeting and conference facilities.
In seeking to offer a competitive proposal Duffy Construction approached Hy-Ten, about the application of finite element (FE) analysis and Bamtec reinforcement to the floor plates. Hy-ten refereed them to Qube Design an independent structural design consultancy that is familiar with the application of FE analysis and Bamtec reinforcement. Qube's calculations were subsequently verified by project structural engineers Walsh Associates.
Application of Hy-Ten’s Bamtec system starts with the use of FE analysis to precisely define the zones of stress within the floor plate and around the vertical columns. Hy-Ten have a greater range of re-bar sizes available, allowing more precise specification of structural steel requirements. Reduction in the quantity of steel needed reduces proportionately the embedded energy in the structure, calculated to be equal to a 42 carbon tonne saving.
The FE analysis data was ported to robotised welding machines in the Hy-Ten factory where reinforcement carpets were produced by precision spot welding each re-bar to flexible steel tapes in the precise position required. Tagged and colour coded to indicate both the position and depth in the floor slab, in accordance with the engineer’s floor plan, the reinforcement carpets were shipped to site in sequence to meet Duffy’s stringent fixing and casting programme.
On site, the reinforcement carpets were positioned and simply rolled out in a simple two-man operation. The need for back-breaking labour to manually position and wire-in each bar is eliminated by Bamtec steel reinforcement. Continual referral back to the engineer’s drawings is not needed as once the carpet is correctly placed all the re-bars on the roll are automatically positioned accurately. Once the carpets are in place supplementary steel bars may be located manually according to the engineer’s instructions.
Bamtec enabled Duffy to save 30 percent on labour and still complete each floor plate in less time than with conventional methods. The Bamtec system is greatly appreciated by re-bar fixers who are less prone to back strain and injury.
More Information
Images are on the web at http://www.ainsmag.co.uk/hy246/4985hy1a-reinforcement-carpet.htm
Bamtec is a system of steel reinforcement for flat concrete slabs developed in Germany. Hy-Ten, one of the UK’s major reinforcement manufacturers, is the exclusive supplier of Bamtec in the UK and Ireland. The system gives significant savings in steel, manpower and time, allowing contracts to proceed more efficiently.
Richard Webster, Director
Hy-Ten Ltd, Bridle Road, Bootle, Merseyside, L30 4UG, UK
Tel. +44 (0)151 525 1745 Fax. +44 (0)151 523 2252
E-mail: rkw@hy-ten.co.uk Web: http://www.hy-ten.co.uk
This release was published on openPR.
Permanent link to this press release:
Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.
You can edit or delete your press release Bamtec Roll-Out Concrete Reinforcement Speeds Completion of Biosciences Incubator here
News-ID: 215099 • Views: …
More Releases from Hy-Ten Ltd
Positional Couplers From Hy-Ten Extends Frictional Welded Coupler Ranges for Con …
Hy-Ten, a pioneer in the UK in the use of friction welded coupler technology for structural reinforcement of concrete, has extended the technique to embrace a new positional coupler range. Fully tested and certified by CARES, the certification authority for reinforcement steels, the couplers are available now.
Director Richard Webster commented, “Friction welded couplers were added to our range just 12 months ago. Engineers and contractors have enthusiastically…
Largest Concrete Frame Building Completed On-Time With Bamtec Prefabricated Stee …
One of the largest concrete frame structures in the UK, the Forth Valley Royal Hospital, was completed on time with the aid of Bamtec, an off-site fabricated steel carpet of floor slab reinforcement. Bamtec is manufactured exclusively by steel reinforcement specialist Hy-Ten in the UK. The use of this reinforcement system also significantly reduced the steel required and in direct consequence the carbon footprint of the project.
The construction…
Prefabricated Roll-Out Steel Reinforcement for Luton Academies Construction
Barnfield South Academy and Barnfield West Academy in Luton have been completed and handed over on time, thanks in part to the use of Hy-Ten’s rollout steel reinforcement system, Bamtec. This has been used for concrete floor construction enabling main contractor Wates Construction to keep on-track despite dreadful weather.
Wates Construction decided to adopt the Bamtec system for concrete floor reinforcement to make time in the schedule. Academies…
More Releases for Bamtec
Positional Couplers From Hy-Ten Extends Frictional Welded Coupler Ranges for Con …
Hy-Ten, a pioneer in the UK in the use of friction welded coupler technology for structural reinforcement of concrete, has extended the technique to embrace a new positional coupler range. Fully tested and certified by CARES, the certification authority for reinforcement steels, the couplers are available now.
Director Richard Webster commented, “Friction welded couplers were added to our range just 12 months ago. Engineers and contractors have enthusiastically…
Largest Concrete Frame Building Completed On-Time With Bamtec Prefabricated Stee …
One of the largest concrete frame structures in the UK, the Forth Valley Royal Hospital, was completed on time with the aid of Bamtec, an off-site fabricated steel carpet of floor slab reinforcement. Bamtec is manufactured exclusively by steel reinforcement specialist Hy-Ten in the UK. The use of this reinforcement system also significantly reduced the steel required and in direct consequence the carbon footprint of the project.
The construction…
Prefabricated Roll-Out Steel Reinforcement for Luton Academies Construction
Barnfield South Academy and Barnfield West Academy in Luton have been completed and handed over on time, thanks in part to the use of Hy-Ten’s rollout steel reinforcement system, Bamtec. This has been used for concrete floor construction enabling main contractor Wates Construction to keep on-track despite dreadful weather.
Wates Construction decided to adopt the Bamtec system for concrete floor reinforcement to make time in the schedule. Academies…
Major Structural Elements at Heathrow T2 completed on Time with Bamtec Roll-Out …
Under a four million pound contract, Hy-Ten has supplied rollout reinforcement for the concrete aprons that form the structural core of the new Heathrow T2 building. Main contractors Laing O’Rourke and engineers HETCo turned to Hy-Ten, suppliers of the Bamtec steel reinforcement system to buy time in the delivery of the project.
One of the largest construction projects in the UK, and certainly the most time critical, the new…
Steel Reinforcement Specialist Launches Friction Welded Coupler
A new benchmark in the coupling of re-bars has been set by steel reinforcement specialist Hy-Ten with the UK’s first ever friction welded coupler. Fully approved by independent test laboratories, the HT Welded Coupler offers enhanced structural performance, significant site productivity gains with additional material cost savings.
“In the past, to create a coupled joint, both bars have to be threaded – one end receiving a coupler in the…
Adverse Winter Winter Weather Beaten by Bamtec to Deliver Urban Regeneration Dev …
Anderson Construction, a reinforced concrete frame specialist, has overcome severe winter weather to complete the structural frames on a new urban regeneration project on schedule. In a development for Bellway at Tower Hamlets, they used the Bamtec system for the concrete floor slab reinforcement from Hy-Ten to sustain the programme momentum and complete the framework on-time.
Space One in Christian Street is a multi level development mixing affordable housing and…