openPR Logo

Press Releases from Green Energy Solutions (1 total)

1. IMS commissioned successfully

1. IMS commissioned successfully Maisprach, May 2010 --- The Vogel moulds and machines AG (Hedrich Group) has successfully commissioned the first IMS at MGC Moser-Glaser AG in Switzerland. The IMS (= Integrated Manufacturing System) is designed for producing hollow insulators from LSR silicone. In the case of MGC, IMS meets the high and individual requirements placed on the production of directly shielded RIP bushings: 1. Integrated production concept 2. Reduced process times by

Go To Page:   1 2 3 4 5 6 7 8 9 10