openPR Logo
Press release

heat 11 builds heater for chemical plant

12-14-2012 04:35 PM CET | Industry, Real Estate & Construction

Press release from: heat 11 GmbH & Co. KG

Installation plan

Installation plan

The Bielefeld specialist for heat transfer and thermal oil applications heat 11 has received in October 2012 another major order for the supply of three heaters for a chemical plant. The heaters shall ensure the heat supply in the plant. Customer and installer of the plant is the to the ThyssenKrupp group associated Uhde Inventa-Fischer.

The heat 11 scope of supply comprises the basic and detail engineering, the supply of the plant components as well as the supervision of the assembly and the start-up at site. Furthermore the customer will be trained at site where the plant is installed. The components to be delivered include thermal oil boilers (vertical) with firing systems, chimney and waste heat recovery units for preheating of the combustion gases. With these measures the efficiency of the boilers is above 90 %.

With the capacity of the complete plant, more than 2.500 single family houses could be supplied with energy.

The requirements for the design of the heat transfer plant to be supplied by heat 11 are tremendously mainly in view of the efficiency and pollutant emission. So despite of an efficiency of about 93 %, the very low limit values for the emission of nitrogen oxides will be observed (80 mg NOX per NM3). Another special feature of this plant lies in the redundant design of the boiler plant. It allows a “flying change” between parts of the plant.

Heaters with waste heat recovery units are part of the heat 11 range of products to increase the energy efficiency which includes also plants for solar thermal power plants as well as the generation and treatment of heat, electricity and gas from biomass.

heat 11 GmbH & Co. KG with its sister, heat 11 solar GmbH & Co. KG, concentrates on the development, construction and production of environmentally-friendly systems and plants for industrial process heat, heat transfer and electrical power generation. The scope of service includes - from the high-quality advice, over the sales and the engineering to the turn-key installation and the service - the full range related to the enduring operation of the plants for national and international customers in industry, chemical and petrochemical industry and electrical power conversion.

heat 11 GmbH & Co. KG
Stephan Kraus (general manager)
Otto-Brenner-Strasse 203
33604 Bielefeld | Germany
Tel. +49 521 989 110-0
Fax +49 521 989 110-60
stephan.kraus@heat11.com

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release heat 11 builds heater for chemical plant here

News-ID: 245616 • Views:

More Releases from heat 11 GmbH & Co. KG

Audit of the extruder manufacturer COPERION successfully passed
(Bielefeld, 1 February 2017) The Bielefeld specialist for industrial process heat, heat transfer and energy conversion heat 11 (Germany) has successfully passed an extensive quality audit of the Stuttgart company COPERION. Since the beginning of 2011 on the market, heat 11 completed an audit of the important customer COPERION from Stuttgart (Germany) at the beginning of this year. COPERION produces extruder for the manufacture of PE and PP that are used
heat 11 heats largest PET production plant in Europe
(Bielefeld, 7 July 2016) In Geel, located around 40 kilometers east of the Belgian port city of Antwerp, on the dead-straight Amocolaan there is an approximately 115-hectar chemical park of the British oil company BP since 1967. In October 2011, JBF Global Europe BVBA - a company of the JBF group (India) specialized on plastics and packing material, began constructing a plant for the manufacture of PET chips. The plant
Diphyl heat transfer plants for PET production in South Africa
(Bielefeld, 30 June 2016) The KAP Diversified Industrial (Pty) Ltd. (HOSAF Division) has reached an agreement with the Bielefeld heat transfer specialist heat 11 GmbH & Co. KG for planning, delivery and commissioning of a diphyl flash heat transfer plant in Durban, South Africa. Aim of HOSAF is to significantly increase the capacity of the PET plant at the Jacobs location (south of Durban). HOSAF (formerly Hoechst South Africa) is the
heat 11 committed Andrew Lochbrunner for liquid salt plants
heat 11 committed Andrew Lochbrunner for liquid salt plants
(Bielefeld, 27 June 2016) "The operation of company Bertrams Heatec AG will be closed as of 31 May 2016.” Since a few weeks, the Linde group spreads this news on the website of the captive subsidiary Bertrams Heatec AG (Switzerland). Dr. Dietmar Hunold, managing partner of the Bielefeld heat 11 GmbH & Co. KG, announced soon after to intensively look after the market for liquid salt plants (molten salt plants).

All 4 Releases


More Releases for Installation

MASAM Gate Installation Services Elevates Home Safety with Professional Garage D …
MASAM Gate Installation Services is proud to announce that it is expanding its residential services to include expert garage door installation and repair. With a focus on safety, trustworthiness, and craftsmanship, MASAM brings trusted expertise and professional support to homeowners seeking safe and modern garage solutions. Main PR London, UK - 26th May. 2025 - MASAM Gate Installation Services, a renowned name in gate and security installations, is pleased to expand its offerings
Installation of Tube fittings and precautions for installation
Installation of Tube fittings and precautions for installation Installation: 1. Saw off a suitable length of seamless steel pipe and remove the burrs at the port. The end face of the pipe should be perpendicular to the axis, and the angle tolerance should not be greater than 0.5 degrees . If the pipe needs to be bent, the length of the straight line from the end of the pipe to the
AV Installation Worksop
AV Installation Worksop – we have nearly completed an AV Installation in a new gym in Worksop with the installation of a Cloud Electronics Sound System and seven Samsung 55″ Commercial TV Screens. Within the main area of the Gym we have installed twelve Cloud CSC8 ceiling speakers throughout the area which are a 75 watt 8 inch ceiling speaker which gives them adequate coverage throughout the work out areas. In the
Multi-Level Installation
Increased flexibility for installing Stauff ACT clamps thanks to the use of safety locking plates and stacking bolts Stauff ACT clamps are an innovatively designed solution for the installation of pipework in applications where efficient protection against corrosion is essential. The development of crevice corrosion on pipelines – a known and documented problem in the oil and gas industry – can be prevented long-term. This solution also generates enormous savings
PELLA Certified Installation Contractor Offers Discounts on Installation
Philadelphia, PA (openpr) june 22, 2011 - PELLA Certified Installation Contractor, Admired Windows and Doors have announced discounts for the 2011 tax breaks. They shall provide discounts for people looking to install casements, awnings, sliding and other types of doors and windows. Besides full service installation, they also provide maintenance, and repairs. “Pella windows and doors as we all know are synonymous with energy efficient products. These products come
Mobile Tower Installation, Installation of TV Tower, Telecommunication Tower Ins …
Safe towers Pvt. Ltd offers services for Telecom Towers installation like Site planning, Obtaining of necessary regulatory approvals Site acquisition, Erection and commissioning of towers, Provision of support services for the towers such as back-up power, air-conditioning and security and Provision of turnkey solutions to telecom companies such as sourcing of equipment, testing and maintenance and all the services. Safe Towers Pvt. Ltd. is the leading manufacturer and supplier of Telecommunication