Press release
Data Center Construction in Southeast Asia Market 2017 Global Analysis By Key Players – CSF Group, M+W Group, Nakano Construction, Sara-Timur, Wah Loon Engineering
WiseGuyReports.Com Publish a New Market Research Report On - “Data Center Construction in Southeast Asia Market 2017 Global Analysis By Key Players – CSF Group, M+W Group, Nakano Construction, Sara-Timur, Wah Loon Engineering”.The analysts forecast the data center construction market in Southeast Asia to grow at a CAGR of 14.8% during the period 2016-2020.
The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and general construction works.
The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in Southeast Asia to construct data centers to gain a competitive edge. Complexities associated with business applications have increased because of enormous growth in data volumes, triggering an increased need for the construction and renovation of data centers. In addition, enterprises are focusing on the building of green data center facilities to reduce power consumption and carbon dioxide emissions.
Get a Sample Report @ https://www.wiseguyreports.com/sample-request/379041-data-center-construction-market-in-southeast-asia-2016-2020
For more information or any query mail at sales@wiseguyreports.com
Covered in this report
The report covers the present scenario and the growth prospects of the data center construction market in Southeast Asia for 2015-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.
The market is divided into the following segments based on electrical construction:
• UPS
• Energy storage equipment
• Generators
• Transfer switches and switchgear
The report, Data Center Construction Market in South East Asia 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.
Key vendors
• CSF Group
• M+W Group
• Nakano Construction
• Sara-Timur
• Wah Loon Engineering
Other prominent vendors
• Alphamatic Systems
• AWP Architects
• CPG Consultants
• DSCO Group
• Kienta Engineering Construction
• Kinetics Corporate
• Nova
• PWS (Malaysia)
• Sato Kogyo
Market driver
• Increased demand for cloud-based services and big data analytics
• For a full, detailed list, view our report
Market challenge
• Poor analysis of business requirements
• For a full, detailed list, view our report
Market trend
• Green data centers
• For a full, detailed list, view our report
Key questions answered in this report
• What will the market size be in 2020 and what will the growth rate be?
• What are the key market trends?
• What is driving this market?
• What are the challenges to market growth?
• Who are the key vendors in this market space?
• What are the market opportunities and threats faced by the key vendors?
• What are the strengths and weaknesses of the key vendors?
Ask Query @ https://www.wiseguyreports.com/enquiry/379041-data-center-construction-market-in-southeast-asia-2016-2020
Table Of Contents – Major Key Points
PART 01: Executive summary
• Highlights
PART 02: Scope of the report
• Market overview
• Top-vendor offerings
PART 03: Market research methodology
• Research methodology
• Economic indicators
PART 04: Introduction
• Key market highlights
PART 05: Market landscape
• Market overview
• Market size and forecast
• Five forces analysis
PART 06: Market segmentation by electrical construction
• UPS systems
• Energy storage equipment
• Generators
• Transfer switches and switchgear
• Others
PART 07: Market segmentation by mechanical construction
• Cooling solutions
• Racks
• Other
PART 08: Market segmentation by general construction
PART 09: Market segmentation by tier standards
• Tier 1 and Tier 2
• Tier 3
• Tier 4
PART 10: Segmentation by countries
• Singapore
• Malaysia
• Thailand
• Indonesia
• Other Southeast Asian countries
PART 11: Market drivers
PART 12: Impact of drivers
PART 13: Market challenges
PART 14: Impact of drivers and challenges
Continue…….
Buy 1-User PDF @ https://www.wiseguyreports.com/checkout?currency=one_user-USD&report_id=379041
For more information or any query mail at sales@wiseguyreports.com
ABOUT US:
Wise Guy Reports is part of the Wise Guy Consultants Pvt. Ltd. and offers premium progressive statistical surveying, market research reports, analysis & forecast data for industries and governments around the globe. Wise Guy Reports features an exhaustive list of market research reports from hundreds of publishers worldwide. We boast a database spanning virtually every market category and an even more comprehensive collection of market research reports under these categories and sub-categories.
Office No.528,Amanora Chambers,Magarpatta Road,Hadapsar,Pune-411028.
This release was published on openPR.
Permanent link to this press release:
Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.
You can edit or delete your press release Data Center Construction in Southeast Asia Market 2017 Global Analysis By Key Players – CSF Group, M+W Group, Nakano Construction, Sara-Timur, Wah Loon Engineering here
News-ID: 859474 • Views: …
More Releases from WiseGuy Research Consultants Pvt. Ltd.
Surveillance 2018 Global Market Net Worth US$ 43600 million Forecast By 2022
WiseGuyReports.Com Publish a New Market Research Report On –“ Surveillance 2018 Global Market Net Worth US$ 43600 million Forecast By 2022”.
Description:
The Surveillance industry has also suffered a certain impact, but still maintained a relatively optimistic growth, the past four years, Surveillance market size to maintain the average annual growth rate of 11.54% from 17980 million $ in 2014 to 24950 million $ in 2017, The analysts believe that in the…
Tunnel Boring Machine (TBM) Market 2018 Global Analysis By Key Players – Herre …
WiseGuyReports.Com Publish a New Market Research Report On –“ Tunnel Boring Machine (TBM) Market 2018 Global Analysis By Key Players – Herrenknecht, CRTG, CRCHI, Robbins, Tianhe, Komatsu, Mitsubishi”.
Description:
The Tunnel Boring Machine (TBM) industry has also suffered a certain impact, but still maintained a relatively optimistic growth, the past four years, Tunnel Boring Machine (TBM) market size to maintain the average annual growth rate of 7.11% from 1880 million $ in…
Ultra Fine Copper Powder 2018 Global Market Net Worth US$ 405 million Forecast B …
WiseGuyReports.Com Publish a New Market Research Report On –“ Ultra Fine Copper Powder 2018 Global Market Net Worth US$ 405 million Forecast By 2022”.
Description:
The Ultra Fine Copper Powder industry has also suffered a certain impact, but still maintained a relatively optimistic growth, the past four years, Ultra Fine Copper Powder market size to maintain the average annual growth rate of 5.27% from 270 million $ in 2014 to 315 million…
Car Leasing Market 2018 Global Share,Trend,Segmentation and Forecast to 2022
WiseGuyReports.Com Publish a New Market Research Report On –“ Car Leasing Market 2018 Global Share,Trend,Segmentation and Forecast to 2022”.
Description:
The Car Leasing industry has also suffered a certain impact, but still maintained a relatively optimistic growth, the past four years, Car Leasing market size to maintain the average annual growth rate of X% from XXXX million $ in 2013 to XXXX million $ in 2016, The analysts believe that in the…
More Releases for Asia
Asia Private Equity Firm, Asia Private Equity Management, Asia Private Equity Se …
The private equity market in China has been rapidly growing in recent years. Private equity (PE) refers to the purchase of shares in a company that are not publicly traded on a stock exchange. PE firms typically target companies that are undervalued or in need of capital for growth, and aim to improve the company's operations and financial performance before selling it at a higher value.
https://boomingfaucet.com/
Asia Private Equity Consulting
E-mail:nolan@pandacuads.com
In China,…
South East Asia Business Jet Market And Top Key Players are Asia Corporate Jet, …
By 2022, the South East Asia Business Jet Markets estimated to reach US$ XX Mn, up from US$ XX Mn in 2016, growing at a CAGR of XX% during the forecast period. The Global Business Jet Market, currently at 21 million USD, contributes the highest share in the market and is poised to grow at the fastest rate in the future. The three broad categories of business jets are Small,…
LIXIL Asia Presents Asia Pacific Property Awards
Through its power brands GROHE and American Standard, LIXIL Asia signs a three-year deal to become the Headline Sponsor of the Asia Pacific Property Awards from 2019 until 2022.
23rd January 2019: The International Property Awards, first established in 1993, are open to residential and commercial property professionals from around the globe. They celebrate the highest levels of achievement by companies operating within the architecture, interior design, real estate and property…
PEOPLEWAVE WINS ASIA TECH PODCAST PITCHDECK ASIA 2019 AWARDS
15 January 2019, Singapore – Peoplewave, Asia’s leading data-driven HR technology company, won the Asia Tech Podcast (ATP) Pitchdeck Asia 2019 Awards, being awarded “Startup Most Likely to Succeed in 2019".
The 2019 Pitchdeck Asia Awards is an opportunity for the Asian Startup Ecosystem to shine a spotlight on some of its best startups. The awards were decided by a public vote. More than 7,200 votes were cast by registered LinkedIn…
Undersea Defence Technology Asia, UDT Asia 2011
Latest Military Diving Technologies featured in UDT Asia
Equipping Asia’s navies with the latest diving technology for asymmetric warfare and
operations
SINGAPORE, 17 October 2011 - Naval diving and underwater special operations is a field that is
seeing increased attention and investment amongst navies in Asia. Units such as the Indonesian Navy‟s KOPASKA, the Republic of Singapore Navy‟s Naval Diving Unit (NDU), the Royal Malaysian Navy‟s PASKAL are increasingly utilising specialised equipment for conducting…
Asia Diligence – Specialist Investigative Due Diligence for Asia & Beyond
Asia Diligence today announced the opening of its European Customer Services office in the United Kingdom. The office is to be managed by Steve Fowler and will focus on providing services to Asia Diligence’s European customers. Asia Diligence is also planning to open a US office in the near future, which will provide customer service to its US and North American clients.
Asked to comment on the move, Luke Palmer, the…
