Press release
Data Center Construction Market in Southeast Asia 2016-2020 - CSF Group, M+W Group, Nakano Construction, Sara-Timur, Wah Loon Engineering
The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and general construction works. The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in Southeast Asia to construct data centers to gain a competitive edge. Complexities associated with business applications have increased because of enormous growth in data volumes, triggering an increased need for the construction and renovation of data centers. In addition, enterprises are focusing on the building of green data center facilities to reduce power consumption and carbon dioxide emissions.The data center construction market in Southeast Asia to grow at a CAGR of 14.8% during the period 2016-2020. The report covers the present scenario and the growth prospects of the data center construction market in Southeast Asia for 2015-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.
Click to get sample PDF with TOC: http://www.researchmoz.us/enquiry.php?type=S&repid=685255
The market is divided into the following segments based on electrical construction:
- UPS
- Energy storage equipment
- Generators
- Transfer switches and switchgear
Browse more details at: http://www.researchmoz.us/data-center-construction-market-in-southeast-asia-2016-2020-report.html
Technavio's report, Data Center Construction Market in South East Asia 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.
Key vendors
- CSF Group
- M+W Group
- Nakano Construction
- Sara-Timur
- Wah Loon Engineering
Other prominent vendors
- Alphamatic Systems
- AWP Architects
- CPG Consultants
- DSCO Group
- Kienta Engineering Construction
- Kinetics Corporate
- Nova
- PWS (Malaysia)
- Sato Kogyo
Market driver
- Increased demand for cloud-based services and big data analytics
- For a full, detailed list, view our report
Key questions answered in this report
- What will the market size be in 2020 and what will the growth rate be?
- What are the key market trends?
- What is driving this market?
- What are the challenges to market growth?
- Who are the key vendors in this market space?
- What are the market opportunities and threats faced by the key vendors?
- What are the strengths and weaknesses of the key vendors?
About Us
ResearchMoz is the world’s fastest growing collection of market research reports worldwide. Our database is composed of current market studies from over 100 featured publishers worldwide. Our market research databases integrate statistics with analysis from global, regional, country and company perspectives. ResearchMoz’s service portfolio also includes value-added services such as market research customization, competitive landscaping, and in-depth surveys, delivered by a team of experienced Research Coordinators.
Albany NY - 12207
United States
Tel: +1-518-621-2074
Tel: 866-997-4948 (Us-Canada Toll Free)
Email: sales@researchmoz.us
Follow us on LinkedIn at: http://bit.ly/1TBmnVG
This release was published on openPR.
Permanent link to this press release:
Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.
You can edit or delete your press release Data Center Construction Market in Southeast Asia 2016-2020 - CSF Group, M+W Group, Nakano Construction, Sara-Timur, Wah Loon Engineering here
News-ID: 631421 • Views: …
More Releases from researchmoz.us
Bicycle Tires Market - Substantial Rise in Industrial Sectors to Offer Growth Pr …
A recent market study published by ResearchMoz on the Global Bicycle Tires market includes industry analysis for 2015-2019 & opportunity assessment for 2020-2030, and delivers a comprehensive assessment of the most important market dynamics. After conducting thorough research on the historical and current growth parameters of the Global Bicycle Tires market, the growth prospects of the market are obtained with maximum precision.
Request Sample Copy of Research Report @ https://www.researchmoz.us/enquiry.php?type=S&repid=3074346
Chapter 01…
Sports And Athletic Insole Market Overview, Cost Structure Analysis, Growth Oppo …
A recent market study published by ResearchMoz on the sports and athletic insole market offers global industry analysis for 2015-2019 & opportunity assessment for 2020-2030. The study offers a comprehensive assessment of the most important market dynamics. After conducting a thorough research on the historical, as well as current growth parameters, the growth prospects of the market are obtained with maximum precision.
Request Sample Copy of Research Report @ https://www.researchmoz.us/enquiry.php?type=S&repid=3074345
Chapter 01…
Clean Label Pectin Market Development Status, Size, Share, Growth and Forecast R …
A recent market study published by ResearchMoz on the Clean Label Pectin Market offers global industry analysis for 2014-2019 & opportunity assessment for 2020–2028. The study offers a comprehensive assessment of the most important market dynamics. After conducting a thorough research on the historical, as well as current growth parameters, the growth prospects of the market are obtained with maximum precision.
Request Sample Copy of Research Report @ https://www.researchmoz.us/enquiry.php?type=S&repid=3069625
Market Segmentation
The global…
Citrus Yogurt Market Growth, Demand, And Value Is Increasing In The Upcoming Yea …
A recent market study published by ResearchMoz on Citrus Yogurt market offers global industry analysis for 2014-2019 & opportunity assessment for 2020–2028. The study offers a comprehensive assessment of most important market dynamics. After conducting a thorough research on historical, as well as current growth parameters, the growth prospects of market are obtained with maximum precision.
Request Sample Copy of Research Report @ https://www.researchmoz.us/enquiry.php?type=S&repid=3067560
Chapter 01 - Executive Summary
The executive summary of…
More Releases for Asia
Asia Private Equity Firm, Asia Private Equity Management, Asia Private Equity Se …
The private equity market in China has been rapidly growing in recent years. Private equity (PE) refers to the purchase of shares in a company that are not publicly traded on a stock exchange. PE firms typically target companies that are undervalued or in need of capital for growth, and aim to improve the company's operations and financial performance before selling it at a higher value.
https://boomingfaucet.com/
Asia Private Equity Consulting
E-mail:nolan@pandacuads.com
In China,…
South East Asia Business Jet Market And Top Key Players are Asia Corporate Jet, …
By 2022, the South East Asia Business Jet Markets estimated to reach US$ XX Mn, up from US$ XX Mn in 2016, growing at a CAGR of XX% during the forecast period. The Global Business Jet Market, currently at 21 million USD, contributes the highest share in the market and is poised to grow at the fastest rate in the future. The three broad categories of business jets are Small,…
LIXIL Asia Presents Asia Pacific Property Awards
Through its power brands GROHE and American Standard, LIXIL Asia signs a three-year deal to become the Headline Sponsor of the Asia Pacific Property Awards from 2019 until 2022.
23rd January 2019: The International Property Awards, first established in 1993, are open to residential and commercial property professionals from around the globe. They celebrate the highest levels of achievement by companies operating within the architecture, interior design, real estate and property…
PEOPLEWAVE WINS ASIA TECH PODCAST PITCHDECK ASIA 2019 AWARDS
15 January 2019, Singapore – Peoplewave, Asia’s leading data-driven HR technology company, won the Asia Tech Podcast (ATP) Pitchdeck Asia 2019 Awards, being awarded “Startup Most Likely to Succeed in 2019".
The 2019 Pitchdeck Asia Awards is an opportunity for the Asian Startup Ecosystem to shine a spotlight on some of its best startups. The awards were decided by a public vote. More than 7,200 votes were cast by registered LinkedIn…
Undersea Defence Technology Asia, UDT Asia 2011
Latest Military Diving Technologies featured in UDT Asia
Equipping Asia’s navies with the latest diving technology for asymmetric warfare and
operations
SINGAPORE, 17 October 2011 - Naval diving and underwater special operations is a field that is
seeing increased attention and investment amongst navies in Asia. Units such as the Indonesian Navy‟s KOPASKA, the Republic of Singapore Navy‟s Naval Diving Unit (NDU), the Royal Malaysian Navy‟s PASKAL are increasingly utilising specialised equipment for conducting…
Asia Diligence – Specialist Investigative Due Diligence for Asia & Beyond
Asia Diligence today announced the opening of its European Customer Services office in the United Kingdom. The office is to be managed by Steve Fowler and will focus on providing services to Asia Diligence’s European customers. Asia Diligence is also planning to open a US office in the near future, which will provide customer service to its US and North American clients.
Asked to comment on the move, Luke Palmer, the…
