openPR Logo
Press release

Clean Modules Create Market Leading Stem Cell and Fertility Facility in Sheffield

03-03-2006 10:49 AM CET | Health & Medicine

Press release from: Clean Modules Ltd.

Clean Room Andrology Lab

Clean Room Andrology Lab

Clean Modules Ltd., the experts in modular prefabricated Clean Rooms, have completed a groundbreaking facility that combines stem cell research with clinical Invitro Fertilisation (IVF) treatment. Believed to be the first in the world, the unit includes EU GMP Grade B cleanroom laboratories together with Grade C operating theatres in a layout designed to optimise the complex workflow.

Built in a restricted 270m2 site within the Jessop Wing of the Royal Hallamshire Hospital for the NHS and University of Sheffield, Clean Modules had a difficult brief and very tight sixteen week timescale to meet the demands of IVF patients waiting for treatment. The commission was for the complete package from planning, project management, build and full IQ OQ PQ validation.

Professor Harry Moore stated; “Clean Modules have created a pioneering new facility that will become the benchmark for other stem cell research centres in the UK and worldwide. We are delighted with the results for both the University and the Hospital.

Senior Embryologist, Rachel Cutting added, “The facility provides our patients with the considerate and straightforward approach, yet behind the scenes there is a complex cleanroom facility delivering a much needed service.”

Clean Modules utilised the experience gained constructing the flagship UK Stem Cell Bank (UKSCB) at the National Institute for Biological Standards and Control (NIBSC) to design and build the facility. This included interpreting the standards governing fertilisation and embryology and MHRA approval. Patient confidentiality was another critical consideration built into the design.

Clean Modules won this major new contract because of their specialisation in the use of cutting edge modular construction, which meant the project could be completed quickly, with minimal disruption to other hospital activities and to a cost effective budget.
The finished facility comprises of two segregated areas controlled by proximity card access. The clinical side includes two Grade C (ISO Class 7) Operating Theatres for egg retrieval and embryo transfer with bespoke one way transfer hatches connected to the culture preparation and IVF laboratories.

The research side has six Grade B (ISO Class 5) cleanroom laboratories each dedicated to a specialist task. In the Embryology, Andrology and Micromanipulation rooms, Class 2 Grade A cabinets are used to provide safe clean working environments. The Cryo Preservation Laboratory is equipped with controlled rate freezing and Dewar liquid nitrogen storage to hold stem cells prior to use.

To meet the stringent requirement covering stem cell research, including a stand alone air handling system, Clean Modules installed a complete Facility Monitoring System (FMS) validated to GAMP4 and CFR21 part 11. This sophisticated computer controlled data acquisition and monitoring system continuously checks particle levels, room pressures, temperature and humidity in the cleanrooms. A consequence of the development in monitoring systems is the absence of traditional Magnehelic pressure gauges.

The FMS system also monitors the liquid nitrogen storage vessels, freezers, refrigerators, incubators and gas levels to ensure conditions are optimised for cell preservation. Variation outside set parameters is covered by an alarm system monitored twenty four hours a day within the main hospital.

Clean Modules specialise in the design, construction and project management of Clean Room installations, controlled environments, clean air and conditioning systems. In addition to specialist biotechnology Clean Rooms, the company has considerable expertise in a wide range of life science applications including pharmaceutical, medical and hospital applications. They have also built up a considerable expertise in modular and mobile facilities including units pre-built and validated off site.

Clean Modules has grown dramatically in the last ten years, and routinely handles a wide range and size of projects, particularly in the healthcare and life science fields from a few thousand pounds up to multi-million pound projects. The company employs specialist, qualified engineers to design and manage projects and three full construction teams on site. In recent years it has completed over 30 hospital and healthcare related cleanroom suites.


www.cleanmodules.co.uk


Contacts:


John Robinson (Director)

Clean Modules Limited
Unit 4, Cockshut Lane Business Centre
Commerce Street
MELBOURNE
Derbyshire
DE73 8GP
United Kingdom

Tel: +44 (0) 1332 865646
Fax: +44 (0) 1332 865848
Email: john@cleanmodules.co.uk



Rachel Cutting (Senior Embryologist)

Assisted Conception Unit
STH NHS Trust
Level 1 Jessop Wing
Treeroot Walk
SHEFFIELD
Yorkshire S10 2JF

Tel: +44 (0) 114 226 8063
Fax: +44 (0) 114 226 8052
E Mail: rachel.cutting@sth.nhs.uk



Julian Sorrell

Centre for Stem Cell Biology
The Jessop Wing
Central Sheffield University
Hospital Trust,
Treeroot Walk
SHEFFIELD
orkshire S10 2JF
Tel: +44 (0)114 222 1082
Fax: +44 (0) 114 226 8538
E Mail: j.a.sorrell@sheffield.ac.uk

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release Clean Modules Create Market Leading Stem Cell and Fertility Facility in Sheffield here

News-ID: 5828 • Views:

More Releases from Clean Modules Ltd.

Modular Cleanroom Construction Makes the Difference at St Georges Hospital, London
Modular Cleanroom Construction Makes the Difference at St Georges Hospital, Lond …
The completion of a 408m2 major new aseptic pharmacy unit for the St Georges Hospital NHS Trust, London, UK is a significant example of the benefits of using modern modular construction techniques compared to a traditional cleanroom build. At every stage; from concept through project planning to final completion, the use of modules proved to be the most appropriate for the task. The result is a superb advanced new facility
The next generation of modular cleanrooms
The next generation of modular cleanrooms
After several years of building modular cleanrooms, Clean Modules Ltd has now developed the next generation of modular cleanrooms. Clean Modules Ltd specialises in constructing bespoke modular cleanrooms and as a result, not two cleanrooms are the same. This diversity has allowed Clean Modules Ltd to continuously develop their modular cleanroom concept. Modular cleanrooms can be used for a wide range of applications: They can provide both temporary and permanent

More Releases for Room

Anger Room Market to Get a New Boost | Anger Room, Smash Therapy, Rage Room
HTF MI just released the Global Anger Room Market Study, a comprehensive analysis of the market that spans more than 143+ pages and describes the product and industry scope as well as the market prognosis and status for 2025-2032. The marketization process is being accelerated by the market study's segmentation by important regions. The market is currently expanding its reach. Major Giants in Anger Room Market are: Anger Room (USA), Smash Therapy
Global Operating Room Communication Market Size - By Product Type(Hardware,Softw …
Operating Room Communication Market Insights: Trends, Drivers, and Outlook 2024 - 2031 Operating Room Communication Market Scope: Unveiling Today's Trends Operating Room Communication refers to the exchange of information and coordination among surgical staff to enhance patient safety and surgical efficiency. The market is experiencing significant growth driven by technological advancements in communication tools and the increasing need for streamlined surgical workflows. The integration of digital platforms, mobile applications, and advanced communication
Escape Room Market Analysis By Top Keyplayers - Breakout Games, All in Adventure …
The "Escape Room Market" is expected to reach USD xx.x billion by 2031, indicating a compound annual growth rate (CAGR) of xx.x percent from 2024 to 2031. The market was valued at USD xx.x billion In 2023. Growing Demand and Growth Potential in the Global Escape Room Market, 2024-2031 Verified Market Research's most recent report, "Escape Room Market: Global Industry Trends, Share, Size, Growth, Opportunity and Forecast 2023-2030," provides an in-depth
Anger Room Market Next Big Thing | Smash Therapy, EXIT Holdings, Rage Room, Smas …
Advance Market Analytics published a new research publication on "Global Anger Room Market Insights, to 2030" with 232 pages and enriched with self-explained Tables and charts in presentable format. In the Study, you will find new evolving Trends, Drivers, Restraints, Opportunities generated by targeting market-associated stakeholders. The growth of the Anger Room market was mainly driven by the increasing R&D spending across the world. Get Free Exclusive PDF Sample Copy of
Escape Room Market is expected to double its market size in Upcoming Years | Key …
“Escape Room Industry 2020 Market Research Report” A new report added by reportsandmarkets.com to its research database. Escape Room Market is segmented by Regions/Countries. All the key market aspects that influence the Escape Room market presently and will have an impact on it have been evaluated and propounded in the Escape Room market research status and development trends reviewed in the new report. “The final report will add the analysis of
COLD ROOM CONSTRUCTION
How to get an official quotation from Akpo Oyegwa Refrigeration Company? For clarification kindly visit the official website as various sizes of cold rooms have been published with the costs included. As soon as you have made your final decision about the exact size of cold room you need then you can proceed further by filling the quotation request form online and an official quotation will be sent to you via e-mail. https://www.nigeriacontractor.com/get-a-quote/