openPR Logo
Press release

Data Center Construction Market 2019-2023 | Global Industry Overview by Aecom, Dpr Construction, Holder Construction Company, Jacobs Engineering Group, Arup Group Limited, M Arthur Gensler Jr & Associates

03-13-2019 06:03 PM CET | IT, New Media & Software

Press release from: Market Prognosis

The global data center construction market was valued at USD 17.15 billion in 2017 and is expected to reach a value of USD 27.64 billion by 2023 at a CAGR of 8.21% over the forecast period of 2018u20132023. The scope of the report is limited to power construction offered by major players involving utility improvements, electrical panels switch gear, transfer switches, generators, enclosures and cabling, N+1 UPS systems, and data center lighting. While the end users considered in the scope of the report include banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, retail colocation, power & energy, and manufacturing.

Detailed Sample Copy of Updated Analysis @ https://marketprognosis.com/sample-request/16282

A data center is a group of networked computer servers used by organizations for the remote storage, processing, or distribution of large amount of data. Internet of Things (IoT) and cloud adoption have witnessed significant growth over the years owing to the simple financial model, backup, and replication provided by cloud-based systems. This has led to the generation of enormous amounts of data, resulting in a growing requirement for construction of new data centers. The bandwidth created by wearable technologies and data analytics are also expected to increase the need for data centers, thereby driving the data center construction market.

Recent Developments
• March 2018: Facebook is planning on build a data center worth about USD 2.5 billion. An initial investment of USD 750 million has been made, and the data center extends to about 970,000 sq. ft.
• March 2018: Edgecore Real estate has started building data centers in its Mesa data center campus. An investment of USD 150 million has been made on its first data center.

The major players include –
AECOM, DPR CONSTRUCTION, HOLDER CONSTRUCTION COMPANY, JACOBS ENGINEERING GROUP, INC., TURNER CONSTRUCTION COMPANY, ARUP GROUP LIMITED, M. ARTHUR GENSLER JR. & ASSOCIATES, INC., HDR, INC., ISG PLC, JONES ENGINEERING GROUP LTD, NAKANO CORPORATION, SCHNEIDER ELECTRIC SE, CURRIE & BROWN GROUP LIMITED, and CORGAN ASSOCIATES, INC., amongst others.

Request Discount on this report @ https://marketprognosis.com/discount-request/16282

Rising Demand for Data Center Colocation
Colocation offers enterprises with the ability to meet business demands at significantly lower costs. Over the years, companies have been identified to lease space in a colocation facility, to avoid costs incurred by the price of establishing a new data center, which is often incredibly cost prohibitive. It has been estimated that around 25% of the cost borne by the company for a new data center comes from spending associated with preliminary planning, designing, and commissioning. To tackle these problems, companies have started investing in data center colocation. This trend is expected to follow over the forecast period owing to the vast array of benefits provided by colocation facilities compared to conventional in-house centers, which is, in turn, expected to drive the data center construction market.

Steady Growth of Banking and Finance Sector
The banking and finance sector is expected to be one of the largest generators of data. Finance and banking structures use data centers to store customer records, employee management transactions, and electronic banking services such as remote banking. Many banks have been identified to maintain their own data centers to regulate and store the enormous amounts of data flowing every day. In recent years, banks have increasingly started deploying new data centers. For instance, the U.S. Bank recently announced its plans to build a USD 250 million data center in Chaska, in a 56,000-square-foot facility. Many banks globally are following suit, which is expected to drive the data center construction market over the forecast period.

North America to Dominate the Industry
North America holds the highest market share owing to high adoption of data centers and rising number of companies over the forecast period. Over the years, the United States has been identified to be one of the fore-runners in the adoption of new technologies. With the rise in big data analytics, companies in that region, to avoid falling short on traditional storage, have been identified to deploy the construction of new data centers and colocation centers to run business analytics. Growing adoption of small and medium-size enterprises as well as home networks in this region is one of the major factors driving the growth of data centers in this region, which is expected to drive data center construction market proportionately. The service industry in the United States has been growing at a robust rate, which in turn is leading to the generation of huge volumes of data. Organizations are increasingly adopting data centers to store and process the acquired data. Moreover, the presence of market incumbents is another factor, which is expected to promote the growth of data center construction market in this region.

Enquiry Before Buying@ https://marketprognosis.com/enquiry/16282

About Market Prognosis
We at Market Prognosis believe in giving a crystal clear view of market dynamics for achieving success in today’s complex and competitive marketplace through our quantitative & qualitative research methods.
We help our clients identify the best market insights and analysis required for their business thus enabling them to take strategic and intelligent decision.
We believe in delivering actionable insights for your business growth and success.

Contact us:
ProgMarkPvt Ltd,
Thane - 421501
India.
Contact No: +1 973 241 5193
Email: sales@marketprognosis.com

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release Data Center Construction Market 2019-2023 | Global Industry Overview by Aecom, Dpr Construction, Holder Construction Company, Jacobs Engineering Group, Arup Group Limited, M Arthur Gensler Jr & Associates here

News-ID: 1652367 • Views:

More Releases from Market Prognosis

Third-Party Logistics (3PL) Market Latest Study Focuses On Current, Future Innovations and Foreseen Till 2026 | FedEx, Exel Logistics, Menlo Worldwide Logistics, Ryder Logistics
Third-Party Logistics (3PL) Market Latest Study Focuses On Current, Future Innov …
The report covers a forecast and an analysis of the Third-Party Logistics (3PL) Market on a global and regional level. The study provides historical data for 2018, 2019, and 2020 along with a forecast from 2019 to 2026 based on revenue and volume. Overview of the Global Third-Party Logistics (3PL) Market: The report spread across 90 pages is an overview of the Global Third-Party Logistics (3PL) Market. These report study based on the Third-Party
Ride-Hailing Market: An Insight on the Important Factors and Trends Influencing by Top Key Players (Didi, Uber, Lyft, Gett, Hailo, Ola Cabs, Cabify, GoCatch) | Foreseen Till 2026
Ride-Hailing Market: An Insight on the Important Factors and Trends Influencing …
The report covers a forecast and an analysis of the Ride-Hailing Market on a global and regional level. The study provides historical data for 2018, 2019, and 2020 along with a forecast from 2019 to 2026 based on revenue and volume. Overview of the Global Ride-Hailing Market: The report spread across 90 pages is an overview of the Global Ride-Hailing Market. These report study based on the Ride-Hailing Market. It is a complete overview
COVID-19 Impact on Professional Indemnity Insurance Market 2021-2026: Industry Insight and Growth Strategy by Business Players - AIG, Chubb (ACE), Allianz, XL Group, AXA, Aviva
COVID-19 Impact on Professional Indemnity Insurance Market 2021-2026: Industry I …
The report covers a forecast and an analysis of the Professional Indemnity Insurance Market on a global and regional level. The study provides historical data for 2018, 2019, and 2020 along with a forecast from 2019 to 2026 based on revenue and volume. Overview of the Global Professional Indemnity Insurance Market: The report spread across 90 pages is an overview of the Global Professional Indemnity Insurance Market. These report study based on the Professional
Modular Construction Market Future Growth Explored in Latest Research Report by 2026 | Komatsu, Kiewit, Skanska, L&T, Taisei, ACS Group, Bouygues Construction
Modular Construction Market Future Growth Explored in Latest Research Report by …
The report covers a forecast and an analysis of the Modular Construction Market on a global and regional level. The study provides historical data for 2018, 2019, and 2020 along with a forecast from 2019 to 2026 based on revenue and volume. Overview of the Global Modular Construction Market: The report spread across 90 pages is an overview of the Global Modular Construction Market. These report study based on the Modular Construction Market. It

All 5 Releases


More Releases for USD

Bone Cement Market Outlook USD 1,871.10M-USD 3,512.31M
How Is the Bone Cement Market Supporting the Rise of Modern Orthopedic Surgery? The Bone Cement Market plays a critical role in modern orthopedic and spinal procedures, acting as a foundational material for joint replacement, fracture fixation, and vertebral stabilization. Bone cement is widely used to anchor implants, restore bone structure, and improve patient mobility-making it an essential component of musculoskeletal care. In 2025, the global bone cement market was valued at
Autologous Cell Therapy Market Outlook USD 9.31B-USD 54.83B
How Is the Autologous Cell Therapy Market Redefining the Future of Precision Medicine? The Autologous Cell Therapy Market is rapidly emerging as one of the most transformative areas in modern healthcare, offering highly personalized treatment options for complex and chronic diseases. By using a patient's own cells to repair, replace, or regenerate damaged tissues, autologous cell therapy minimizes immune rejection risks while maximizing therapeutic effectiveness. In 2025, the global autologous cell therapy
PACS Market USD 5.59B in 2025, USD 9.73B by 2035
Picture Archiving and Communication System (PACS) Market Expands as Digital Imaging Transforms Global Healthcare Introduction: PACS at the Core of Modern Medical Imaging The healthcare industry is undergoing a rapid digital transformation, with medical imaging playing a critical role in diagnosis, treatment planning, and patient monitoring. At the heart of this transformation lies the Picture Archiving and Communication System (PACS)-a technology that enables the storage, retrieval, management, and sharing of medical images
Global HEOR Market USD 1.70B-USD 6.03B
Health Economics and Outcomes Research (HEOR) Market Accelerates as Value-Based Healthcare Redefines Global Decision-Making Introduction: The Growing Importance of HEOR in Modern Healthcare The global healthcare industry is undergoing a profound transformation, shifting from volume-driven care models to value-based healthcare systems that prioritize patient outcomes, cost efficiency, and real-world effectiveness. At the center of this transformation lies Health Economics and Outcomes Research (HEOR)-a discipline that evaluates the economic value, clinical outcomes, and
Foam Tape Market Outlook 2035: Industry Growth from USD USD 4.89 Billion (2025) …
The Foam Tape Market plays a vital role in modern industrial and manufacturing ecosystems. Foam tapes are pressure-sensitive adhesive products manufactured using materials such as polyurethane, polyethylene, PVC, and acrylic foam. These tapes are widely used for bonding, sealing, insulation, cushioning, vibration damping, and noise reduction across multiple industries. Their ability to replace traditional mechanical fasteners like screws, bolts, and rivets has positioned foam tapes as a preferred solution in
Chlorella Market Reach USD 465.85 Million USD by 2030
Market Growth Fueled by Increased Adoption of Plant-Based Proteins and Health Supplements Global Chlorella Market size was valued at USD 303.75 Mn. in 2023 and the total Chlorella revenue is expected to grow by 6.3 % from 2024 to 2030, reaching nearly USD 465.85 Mn. . The growth of the market is majorly due to increase in the consumer awareness about health, the inclination towards plant-based food such as chlorella and