Press release
Data Center Construction Market Size 2019 by Top Key Players: Aceco TI, AECOM, Turner Construction, Equinix, Fluor, DPR Construction, Constructora Sudamericana S.A.
The Data Center Construction Market research report fabricated by Market Study Report, LLC, is an in-depth analysis of the latest trends persuading the business outlook. The report also offers a concise summary of statistics, market valuation, and profit forecast, along with elucidating paradigms of the evolving competitive environment and business strategies enforced by the behemoths of this industry.A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Request a sample of this premium report at https://www.marketstudyreport.com/request-a-sample/1602213?utm_source=openpr.com&utm_medium=Abhijeet
Market Segment by Companies, this report covers
• Aceco TI
• AECOM
• Turner Construction
• Equinix
• Fluor
• DPR Construction
• Constructora Sudamericana S.A.
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.
Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
A data center is used to house an enterprise IT infrastructure. They constitute the backbone of essential business operations. The demand for cloud-based services is increasing among enterprises including many Fortune 500 companies. Several industries are making use of advanced technologies to gain a competitive advantage.
The complexities associated with business applications have increased because of the enormous growth in data volumes. This has triggered a greater need for construction and renovation of data centers. Enterprises are focusing on constructing green data centers to reduce power consumption and environmental impact. The construction of a data center includes design, architecture, installation of electrical and mechanical systems, and incorporation of security mechanisms. Infrastructure certifications also play a vital role in the building of data center facilities.
Internet of things (IoT), which requires a data center, is experiencing tremendous growth. Data centers are more suitable for storing and processing data generated by devices connected to the internet, and also to meet the demand for real-time computing. Therefore, the market is set to witness an increase in data centers that are reliable and scalable in nature. The growing demand for cloud computing and big data analytics are also assumed to have an impact on this market, thereby driving the growth of the Latin America Data Center Construction market during the forecast period.
The global Data Center Construction market is valued at xx million in 2018 and is expected to reach xx million by the end of 2024, growing at a CAGR of xx% between 2019 and 2024.
The Asia-Pacific will occupy for more market share in following years, especially in China, also fast growing India and Southeast Asia regions.
North America, especially The United States, will still play an important role which cannot be ignored. Any changes from United States might affect the development trend of Data Center Construction.Europe also play important roles in global market, with market size of xx million in 2019 and will be xx million in 2024, with a CAGR of xx%.
This report studies the Data Center Construction market status and outlook of Global and major regions, from angles of players, countries, product types and end industries; this report analyzes the top players in global market and splits the Data Center Construction market by product type and applications/end industries.
Request a discount on standard prices of this premium at https://www.marketstudyreport.com/check-for-discount/1602213?utm_source=openpr.com&utm_medium=Abhijeet
Market Segment by Regions, regional analysis covers
North America (United States, Canada and Mexico)
Europe (Germany, France, UK, Russia and Italy)
Asia-Pacific (China, Japan, Korea, India and Southeast Asia)
South America (Brazil, Argentina, Colombia)
Middle East and Africa (Saudi Arabia, UAE, Egypt, Nigeria and South Africa)
Market Segment by Type, covers
Electrical Construction
Mechanical Construction
General Construction
Market Segment by Applications, can be divided into
Finance
Internet
Telecommunications
Government
Others
Table of Contents
1 Data Center Construction Market Overview
2 Manufacturers Profiles
3 Global Data Center Construction Market Competition, by Players
4 Global Data Center Construction Market Size by Regions
5 North America Data Center Construction Revenue by Countries
6 Europe Data Center Construction Revenue by Countries
7 Asia-Pacific Data Center Construction Revenue by Countries
8 South America Data Center Construction Revenue by Countries
9 Middle East and Africa Revenue Data Center Construction by Countries
10 Global Data Center Construction Market Segment by Type
11 Global Data Center Construction Market Segment by Application
12 Global Data Center Construction Market Size Forecast (2019-2024)
13 Research Findings and Conclusion
14 Appendix
Complete report at https://www.marketstudyreport.com/reports/global-data-center-construction-market-2019-by-company-regions-type-and-application-forecast-to-2024?utm_source=openpr.com&utm_medium=Abhijeet
About Us:
Marketstudyreport.com allows you to manage and control all corporate research purchases to consolidate billing and vendor management. You can eliminate duplicate purchases and customize your content and license management.
Contact Us:
Market Study Report LLC
4 North Main Street,
Selbyville, Delaware 19975
USA
Phone: 1-302-273-0910
US Toll Free: 1-866-764-2150
Email: sales@marketstudyreport.com
Website: https://www.marketstudyreport.com
Blog: https://www.marketstudyreport.com/blog
This release was published on openPR.
Permanent link to this press release:
Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.
You can edit or delete your press release Data Center Construction Market Size 2019 by Top Key Players: Aceco TI, AECOM, Turner Construction, Equinix, Fluor, DPR Construction, Constructora Sudamericana S.A. here
News-ID: 1586310 • Views: …
More Releases from marketstudyreport.com
Load Bank Market Growth Prospectus by 2028 - Business Opportunities by ASCO Powe …
A concise assortment of data on the 'Load Bank Market' offers an exhaustive study targeting current market trends influencing the business across assorted regions. Significant details related to market size, market share, applications, and statistics are put together to convey an ensemble prediction of the industry. The research further focuses on comprehensive competitor analysis in addition to highlighting growth strategies embraced by market leaders.
Load Bank Market Size was estimated…
Agriculture Equipment Market is Expected to Reach USD 161640 Million by 2028 - J …
Global Agriculture Equipment Market with respect to the pivotal drivers influencing the revenue graph of this business sphere. The current trends of the market with the geographical landscape, demand, remuneration scale, and growth of this vertical have also been included in this report.
Global Agriculture Equipment Market Size was estimated at USD 114110 million in 2021 and is projected to reach USD 161640 million by 2028, exhibiting a CAGR of…
Electric Vehicle Market Size to grow at a CAGR of 23.5% through 2028| Tesla Inc. …
Global Electric Vehicle Market with respect to the pivotal drivers influencing the revenue graph of this business sphere. The current trends of market with the geographical landscape, demand, remuneration scale, and growth of this vertical have also been included in this report.
The electric vehicles (EVs) market is estimated to witness a robust growth rate of 23.5% during the period 2019-2028.
The operation is done to stop ligament tears and…
Fuel Cell Air Compressor Market is Expected to Reach USD 512.3 Million by 2028 - …
Global Fuel Cell Air Compressor Market with respect to the pivotal drivers influencing the revenue graph of this business sphere. The current trends of market with the geographical landscape, demand, remuneration scale, and growth of this vertical have also been included in this report.
Global Fuel Cell Air Compressor Market Size was estimated at USD 215.1 million in 2021 and is projected to reach USD 512.3 million by 2028, exhibiting…
More Releases for Construction
Off-site Construction Market: Revolutionizing Construction
In the dynamic landscape of the construction industry, off-site construction has emerged as a game-changer, set to transform the way we build. The market, valued at USD 249.15 billion in 2022, is poised for a remarkable growth spurt, projecting a 5.8% increase in revenue to reach a staggering USD 369.72 billion by 2029.
Know More About The Report:
https://www.maximizemarketresearch.com/market-report/off-site-construction-market/169386/
Unlocking Off-site Construction: A Holistic Overview
Off-site construction isn't just a building method; it's a…
Future Prospects of Data Center Construction Market by 2029 - Whiting-Turner Con …
Datacenter physical facility in an enterprise is designed to share IT operations and equipment to store, process, and disseminate data and applications.
The construction process refers to activities involved in the designing, planning, and construction of a facility. Datacenter costs comprise IT infrastructure, power distribution and cooling solutions, and several miscellaneous expenses.
Get Sample Report with Latest Industry Trends Analysis:
https://a2zmarketresearch.com/sample-request/674529
The top companies in this report include:
Whiting-Turner Contracting, Turner Construction, Holder…
Data Center Construction Market Analysis to 2028: Industry Growth, Size, Trends …
The Data Center Construction market report focused on the industry dynamics, including market growth elements. The report also identifies limitations and chances for high segments of market growth. Our world-renowned analyst team conducts a study that is a result of extensive primary and secondary research. The growth of the market is forecast with complex algorithms such as regression analysis, end-user analysis, etc. PESTEL analyses are the factors that influence global…
Residential Construction Market Is Booming Worldwide | Hindustan Construction, S …
A new research document is added in HTF MI database of 384 pages, titled as 'Residential Construction Global Industry Guide - Market Summary, Competitive Analysis and Forecast to 2025' with detailed analysis, Competitive landscape, forecast and strategies. Latest analysis highlights high growth emerging players and leaders by market share that are currently attracting exceptional attention. The identification of hot and emerging players is completed by profiling 50+ Industry…
Data Center Construction Market Next Big Thing 2026 | DPR Construction, Holder C …
Global data center construction market is projected to register a CAGR of 11.1% in the forecast period of 2019 to 2026.Global Data Center Construction Market By Infrastructure Type (electrical Infrastructure, mechanical infrastructure, general infrastructure), Data Center Type (Tier I, Tier II, Tier III, Tier IV), Organization Size (small organization, medium organization, large organization), Vertical (Banking, financial services and insurance, IT & Telecommunications, Government & Defense, Healthcare, Retail Colocation, Power &…
Data Center Construction Market Next Big Thing 2026 | DPR Construction, Holder C …
Global data center construction market is projected to register a CAGR of 11.1% in the forecast period of 2019 to 2026.Global Data Center Construction Market By Infrastructure Type (electrical Infrastructure, mechanical infrastructure, general infrastructure), Data Center Type (Tier I, Tier II, Tier III, Tier IV), Organization Size (small organization, medium organization, large organization), Vertical (Banking, financial services and insurance, IT & Telecommunications, Government & Defense, Healthcare, Retail Colocation, Power &…
