Press release
Global Data Center Construction Market : Competitive Insight and Key Drivers Analysis - Aceco TI, AECOM, Turner Construction, Equinix, Fluor
Qyresearchreports include new market research report Global Data Center Construction Market Size, Status and Forecast 2025 to its huge collection of research reports.This report studies the global Data Center Construction market size, industry status and forecast, competition landscape and growth opportunity. This research report categorizes the global Data Center Construction market by companies, region, type and end-use industry.
A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Request Free Estimate : https://www.qyresearchreports.com/sample/sample.php?rep_id=1846159&type=S
Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.
Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
A data center is used to house an enterprise IT infrastructure. They constitute the backbone of essential business operations. The demand for cloud-based services is increasing among enterprises including many Fortune 500 companies. Several industries are making use of advanced technologies to gain a competitive advantage. The complexities associated with business applications have increased because of the enormous growth in data volumes. This has triggered a greater need for construction and renovation of data centers. Enterprises are focusing on constructing green data centers to reduce power consumption and environmental impact. The construction of a data center includes design, architecture, installation of electrical and mechanical systems, and incorporation of security mechanisms. Infrastructure certifications also play a vital role in the building of data center facilities.
Internet of things (IoT), which requires a data center, is experiencing tremendous growth. Data centers are more suitable for storing and processing data generated by devices connected to the internet, and also to meet the demand for real-time computing. Therefore, the market is set to witness an increase in data centers that are reliable and scalable in nature. The growing demand for cloud computing and big data analytics are also assumed to have an impact on this market, thereby driving the growth of the Latin America Data Center Construction market during the forecast period.
In 2017, the global Data Center Construction market size was xx million US$ and it is expected to reach xx million US$ by the end of 2025, with a CAGR of xx% during 2018-2025.
This report focuses on the global top players, covered
Aceco TI
AECOM
Turner Construction
Equinix
Fluor
DPR Construction
Constructora Sudamericana S.A.
Browse Report Details @ https://www.qyresearchreports.com/report/global-data-center-construction-market-size-status-and-forecast-2025.htm
Market segment by Regions/Countries, this report covers
United States
Europe
China
Japan
Southeast Asia
India
Market segment by Type, the product can be split into
Electrical Construction
Mechanical Construction
General Construction
Market segment by Application, split into
Finance
Internet
Telecommunications
Government
Others
The study objectives of this report are:
To study and forecast the market size of Data Center Construction in global market.
To analyze the global key players, SWOT analysis, value and global market share for top players.
To define, describe and forecast the market by type, end use and region.
To analyze and compare the market status and forecast between China and major regions, namely, United States, Europe, China, Japan, Southeast Asia, India and Rest of World.
To analyze the global key regions market potential and advantage, opportunity and challenge, restraints and risks.
To identify significant trends and factors driving or inhibiting the market growth.
To analyze the opportunities in the market for stakeholders by identifying the high growth segments.
To strategically analyze each submarket with respect to individual growth trend and their contribution to the market
To analyze competitive developments such as expansions, agreements, new product launches, and acquisitions in the market
To strategically profile the key players and comprehensively analyze their growth strategies.
For the data information by region, company, type and application, 2017 is considered as the base year. Whenever data information was unavailable for the base year, the prior year has been considered.
Key Stakeholders
Data Center Construction Manufacturers
Data Center Construction Distributors/Traders/Wholesalers
Data Center Construction Subcomponent Manufacturers
Industry Association
Downstream Vendors
About Us:
QYResearchReports.com delivers the latest strategic market intelligence to build a successful business footprint in China. Our syndicated and customized research reports provide companies with vital background information of the market and in-depth analysis on the Chinese trade and investment framework, which directly affects their business operations. Reports from QYResearchReports.com feature valuable recommendations on how to navigate in the extremely unpredictable yet highly attractive Chinese market.
Contact Us:
Brooklyn, NY 11230
United States
Toll Free: 866-997-4948 (USA-CANADA)
Tel: +1-518-621-2074
Follow Us on LinkedIn: https://www.linkedin.com/company/qyresearchreports-com
Web: https://www.qyresearchreports.com
Email: sales@qyresearchreports.com
This release was published on openPR.
Permanent link to this press release:
Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.
You can edit or delete your press release Global Data Center Construction Market : Competitive Insight and Key Drivers Analysis - Aceco TI, AECOM, Turner Construction, Equinix, Fluor here
News-ID: 1527956 • Views: …
More Releases for China
China fund establishment, China fund management,china investment management
Pandacu China is a leading financial institution that specializes in providing fund establishment and management services for domestic and international investors looking to invest in China. The company was founded in 2015 by a team of experienced finance professionals with a deep understanding of the Chinese market and a strong network of contacts in the investment industry.
https://boomingfaucet.com/
China Fund Establishment Consultation
E-mail:nolan@pandacuads.com
Investing in China can be a complex and challenging process, and…
China Finance Advisor, China Debt Finance Corporation,China Investment Corporati …
Investment bank is a financial institution that helps companies and governments raise capital by underwriting and issuing securities, and also provides advice on mergers and acquisitions, strategic investments, and other financial matters. Investment banks typically have a team of professionals with expertise in various areas such as corporate finance, securities underwriting, sales and trading, and market research.
http://pandacuads.com/
China Investment Corporation
Email:nolan@pandacuads.com
Some of the main services provided by investment banks include:
Underwriting: Investment banks…
China Investment Bank, China Investment Consultant, China Investment Corporation …
Pandacu is a company that specializes in cross-border investment in China. The company was founded in china and has since grown to become one of the leading cross-border investment firms in China. Pandacu offers a wide range of services to its clients, including investment advisory, market research, due diligence, and post-investment support.
http://pandacuads.com/
Investment banking consultant
Email:nolan@pandacuads.com
Cross-border investment in China can be a complex and challenging process, as the country has a unique…
china construction company,china engineering company,china major bridge engineer …
List of Top 500 Chinese Construction Enterprises
ranking
https://gzwatches.cn/
Free engineering construction consultation
Email:nolan@wholsale9.com
Company Name
province
1
China State Construction Corporation Limited
Beijing
2
China Railway Corporation Limited
Beijing
3
China Railway Construction Corporation Limited
Beijing
4
Shanghai Weimengsi Construction Engineering Co., Ltd.
Shanghai
5
China Communications Construction Group Co., Ltd.
Beijing
6
China Power Construction Corporation Limited
Beijing
7
China Energy Construction Group Co., Ltd.
Beijing
8
Shanghai Construction Engineering Group Co., Ltd.
Shanghai
9
Jiangsu Zhongnan Construction Industry Group Co., Ltd.
Jiangsu
10
China Gezhouba Group Co., Ltd.
Hubei
11
China National Chemical Engineering Co., Ltd.
Beijing
12
Sinoma Group Co., Ltd.
Beijing
13
Guangxi Construction Engineering Group Co., Ltd.
Guangxi
14
Shanghai Urban…
Forehead Thermometer Market Analysis (2019- 2025)| Microlife (China), Radiant (C …
This research study is one of the most detailed and accurate ones that solely focus on the global Forehead Thermometer market. It sheds light on critical factors that impact the growth of the global Forehead Thermometer market on several fronts. Market participants can use the report to gain a sound understanding of the competitive landscape and strategies adopted by leading players of the global Forehead Thermometer market. The authors of…
Global Color Steel Tile Market 2017 - South China, East China, Southwest China, …
Color Steel Tile Market Research Report
A market study based on the " Color Steel Tile Market " across the globe, recently added to the repository of Market Research, is titled ‘Global Color Steel Tile Market 2017’. The research report analyses the historical as well as present performance of the worldwide Color Steel Tile industry, and makes predictions on the future status of Color Steel Tile market on the basis…
