Press release
US Data center Construction Market is poised to grow at a CAGR of 4.38% during 2016-2020
Albany, NY, May 11, 2017: The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and general building works.The US is a suitable location for data center construction due to benefits such as low electricity cost, high network connectivity, tax incentives, ease of business operations, and availability of resources.
With the increase in data center construction in the US, investments in network connectivity are expected to grow for continued operational support. State governments are offering tax incentives for enterprises planning to establish a data center presence. In addition, they are reducing electricity prices for these businesses and promoting the use of renewable energy. Therefore, the generation of renewables, for both commercial and consumer use, is growing to support green initiatives.
The data center construction market in the US to grow at a CAGR of 4.38% during the period 2016-2020. The report covers the present scenario and the growth prospects of the data center construction market in the US for 2016-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.
Get a Sample Research PDF with TOC: http://www.researchmoz.us/enquiry.php?type=S&repid=711541
The market is divided into the following segments based on electrical construction:
- UPS
- Energy storage equipment
- Generators
- Transfer switches and switchgear
Technavio's report, Data Center Construction Market in the US 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.
Key vendors
- Corgan Associates
- DPR Construction
- Fluor
- Gensler
- HDR
- Holder Construction
- Jacobs
- Syska Hennessy Group
- Turner Construction Company
Other prominent vendors
- AECOM
- AKF Group
- Balfour Beatty
- Carlson Design Construct
- Clune Construction
- Fortis Construction
- Gilbane
- Hensel Phelps
- HITT Contracting
- Integrated Design Group
- JE Dunn Construction................
Enquiry at: http://www.researchmoz.us/enquiry.php?type=E&repid=711541
Key questions answered in this report
- What will the market size be in 2020 and what will the growth rate be?
- What are the key market trends?
- What is driving this market?
- What are the challenges to market growth?
- Who are the key vendors in this market space?
- What are the market opportunities and threats faced by the key vendors?
- What are the strengths and weaknesses of the key vendors?
Browse more details at: http://www.researchmoz.us/data-center-construction-market-in-us-2016-report.html
ResearchMoz is the world’s fastest growing collection of market research reports worldwide. Our database is composed of current market studies from over 100 featured publishers worldwide. Our market research databases integrate statistics with analysis from global, regional, country and company perspectives. ResearchMoz’s service portfolio also includes value-added services such as market research customization, competitive landscaping, and in-depth surveys, delivered by a team of experienced Research Coordinators.
Albany NY - 12207
United States
Tel: +1-518-621-2074
Tel: 866-997-4948 (Us-Canada Toll Free)
Email: sales@researchmoz.us
Follow us on LinkedIn at: http://bit.ly/1TBmnVG
This release was published on openPR.
Permanent link to this press release:
                     Copy
                  
                 Please set a link in the press area of your homepage to this press release on openPR.  openPR disclaims liability for any content contained in this release. 
    You can edit or delete your press release US Data center Construction Market is poised to grow at a CAGR of 4.38% during 2016-2020 here
News-ID: 532217 • Views: …
More Releases from researchmoz.us
                                            
                                                    Bicycle Tires Market - Substantial Rise in Industrial Sectors to Offer Growth Pr …                                                
                                            
                                        
                                            A recent market study published by ResearchMoz on the Global Bicycle Tires market includes industry analysis for 2015-2019 & opportunity assessment for 2020-2030, and delivers a comprehensive assessment of the most important market dynamics. After conducting thorough research on the historical and current growth parameters of the Global Bicycle Tires market, the growth prospects of the market are obtained with maximum precision.
Request Sample Copy of Research Report @ https://www.researchmoz.us/enquiry.php?type=S&repid=3074346
Chapter 01…  
                                        
                                    
                                            
                                                    Sports And Athletic Insole Market Overview, Cost Structure Analysis, Growth Oppo …                                                
                                            
                                        
                                            A recent market study published by ResearchMoz on the sports and athletic insole market offers global industry analysis for 2015-2019 & opportunity assessment for 2020-2030. The study offers a comprehensive assessment of the most important market dynamics. After conducting a thorough research on the historical, as well as current growth parameters, the growth prospects of the market are obtained with maximum precision.
Request Sample Copy of Research Report @ https://www.researchmoz.us/enquiry.php?type=S&repid=3074345
Chapter 01…  
                                        
                                    
                                            
                                                    Clean Label Pectin Market Development Status, Size, Share, Growth and Forecast R …                                                
                                            
                                        
                                            A recent market study published by ResearchMoz on the Clean Label Pectin Market offers global industry analysis for 2014-2019 & opportunity assessment for 2020–2028. The study offers a comprehensive assessment of the most important market dynamics. After conducting a thorough research on the historical, as well as current growth parameters, the growth prospects of the market are obtained with maximum precision.
Request Sample Copy of Research Report @ https://www.researchmoz.us/enquiry.php?type=S&repid=3069625
Market Segmentation
The global…  
                                        
                                    
                                            
                                                    Citrus Yogurt Market Growth, Demand, And Value Is Increasing In The Upcoming Yea …                                                
                                            
                                        
                                            A recent market study published by ResearchMoz on Citrus Yogurt market offers global industry analysis for 2014-2019 & opportunity assessment for 2020–2028. The study offers a comprehensive assessment of most important market dynamics. After conducting a thorough research on historical, as well as current growth parameters, the growth prospects of market are obtained with maximum precision.
Request Sample Copy of Research Report @ https://www.researchmoz.us/enquiry.php?type=S&repid=3067560
Chapter 01 - Executive Summary
The executive summary of…  
                                        
                                    More Releases for Construct
                                                    Global Construct Metall Skirting Market Size, Share & Forecast 2025-2031                                                
                                            
                                        
                                            Unlock the Future of the Construct Metall Skirting Market: Comprehensive Global Market Report 2025-2031
Global leading market research publisher QYResearch published the release of its latest report, "Construct Metall Skirting - Global Market Share, Ranking, Sales, and Demand Forecast 2025-2031". This in-depth report provides a complete analysis of the global Construct Metall Skirting market, offering critical insights into market size, share, demand, industry development status, and future forecasts. Whether you're a…  
                                        
                                    
                                                    Lightspeed Electrical Completes Design & Construct Electrical Fitout for Blackto …                                                
                                            
                                        
                                            The company celebrates a significant achievement, marking its continued growth and success in the Electrical Fitout sector with the completion of Little Zak's Childcare Centre in Blacktown-a project showcasing innovation, safety, and excellence in modern educational facility infrastructure.
Image: https://www.globalnewslines.com/uploads/2025/05/cc1000bedf31190dfff8513e8412f581.jpg
Lightspeed Electrical Pty. Ltd. is proud to announce the successful completion of the electrical scope for the newly constructed Little Zak's Childcare Centre in Blacktown. Delivered in collaboration with Insight Building Services,…  
                                        
                                    
                                                    LEAWOD to Participate in Big 5 Construct Saudi 2025 l Second week                                                
                                            
                                        
                                            LEAWOD, a leading manufacturer of high-quality doors and windows, is excited to announce its participation in the Big 5 Construct Saudi 2025 l Second week. The exhibition will take place from February 24th to 27th, 2025, at the Riyadh Front Exhibition & Convention center.
The Big 5 Construct Saudi is one of the most significant events in the construction industry in Saudi Arabia, providing a platform for companies to showcase their…  
                                        
                                    
                                                    CD Bioparticles Launches Innovative Organoid Construct Kit to Advance Drug Disco …                                                
                                            
                                        
                                            CD Bioparticles launches Organoid Construct Kits to the scientific community to facilitate the construction of complex organoid models.
CD Bioparticles, a leading manufacturer and supplier of numerous drug delivery products and services, has announced the launch of its Organoid Construct Kits [https://www.cd-bioparticles.net/medical-device] to the scientific community to facilitate the construction of complex organoid models, enabling researchers to advance drug discovery and development, disease modeling, and personalized medicine.
Organoids are microscopic organ-like structures…  
                                        
                                    
                                                    Grasim Collaborates With the Specialty Chemicals Giant Lubrizol to Construct Ind …                                                
                                            
                                        
                                            Grasim Industries Ltd., Aditya Birla’s flagship company has inked pact with Ohio-based Lubrizol Advanced Materials, a subsidiary of Warren Buffett’s Berkshire Hathway, to manufacture and supply chlorinated polyvinyl chloride (CPVC) resin that is widely used in hot and cold water delivery pipes in India. This polymer will be manufactured at Grasim’s Chlor-alkali unit located at Vilayat, Gujarat.
Get more info : https://www.chemanalyst.com/NewsAndDeals/DealsDetails/grasim-collaborates-with-the-specialty-chemicals-giant-lubrizol-to-construct-75 
As per the company officials, the construction of the…  
                                        
                                    
                                                    Anti-icing Coatings Market: Manufacturers Vie to Construct a Self-Sustainable Lu …                                                
                                            
                                        
                                            The icing of surfaces is an underlying issue which incurs high cost and handicaps safety and functionality. There has been several instances of icing having the toll on ships, aircraft, cars, railways, cooling systems, roller shutters and wind turbines. Nevertheless, the deposition of ice on surface leads to lower energy output, higher energy consumption and an increased risk of accidents. Besides, icing is known to cause increased maintenance and downtimes,…  
                                        
                                    