openPR Logo
Press release

Homagic Wins Phase II Contract for 12,000 Permanent Worker Accommodation Units at Saudi Arabia's NEOM

11-21-2025 05:02 PM CET | Industry, Real Estate & Construction

Press release from: ABNewswire

Homagic Wins Phase II Contract for 12,000 Permanent Worker

Riyadh, Saudi Arabia - November 21, 2025 - China Construction Integrated Building Co., Ltd. (CSCEC), through its Homagic brand, has been awarded a SAR 2.8 billion (approximately $746 million) contract to deliver 12,000 permanent worker accommodation units for Phase II of NEOM's construction workforce housing program. The award marks one of the largest single modular integrated construction (MiC) contracts ever signed in the Middle East and reinforces Homagic's growing presence in the Kingdom's giga-project ecosystem.

The Middle East's Construction Boom and the Urgent Need for Scalable, High-Quality Worker Housing

Saudi Arabia is in the midst of the most ambitious construction surge in modern history. Vision 2030 projects - led by NEOM, The Red Sea Global, Qiddiya, and Diriyah Gate - are projected to require a peak workforce of over 1.8 million workers by 2028, according to Knight Frank's 2025 KSA Construction Market Report. Traditional site-built dormitories have repeatedly failed to keep pace, suffering from chronic delays, cost overruns, and variable quality.

Image: https://www.abnewswire.com/upload/2025/11/739791074d52480934f64a73ab4e6968.jpg

Modular construction has emerged as the Kingdom's fastest-growing solution. The Saudi modular building market is forecast to grow from $4.1 billion in 2024 to $9.8 billion by 2030 at a 15.6% CAGR (ResearchAndMarkets, 2025), driven by:

* Government mandates for 50-year durable worker accommodation under the Ministry of Municipal, Rural Affairs and Housing (MOMRAH)
* NEOM's own requirement for net-zero carbon construction camps
* Labor welfare reforms requiring air-conditioned, en-suite rooms with Wi-Fi and recreational facilities
* Extreme urgency - NEOM's Spine and Oxagon districts alone need 200,000+ beds delivered before 2029

Phase I of NEOM's worker cities, completed in 2023-2024 by a mix of regional and international modular providers, demonstrated that 90% off-site fabrication can cut delivery time by 45% and reduce on-site waste by up to 80%. Phase II raises the bar: all new units must achieve permanent 50-year structural certification, full LEED Gold/ESTIDAMA Pearl compliance, and zero-carbon operational status.

Homagic: Delivering Permanent, Zero-Carbon Worker Cities at Industrial Scale

Backed by CSCEC - the world's largest EPC contractor and Fortune Global 500 #13 - Homagic operates eight digital factories in China with a combined annual capacity exceeding 100,000 MiC units following 2025 expansions. The company's Light Gauge Steel (LGS) and hybrid Concrete-Steel MiC (CMC) systems are already proven in extreme climates, from Wuhan's hospitals built in 10 days to Beijing's 90-day hutong renewal projects.

Key Features of Homagic's NEOM Phase II Solution

* Structure: Hybrid CMC system combining concrete core durability with light-gauge steel speed
* Lifespan: 50-year permanent certification (meets MOMRAH & ICC-ES requirements)
* Unit size: 24-32 m en-suite rooms with built-in furniture, HVAC, and smart controls
* Energy: 100% solar-powered micro-grids + battery storage; operational carbon footprint < 3 kg CO/m/year
* Factory completion: 92% off-site (MEP, finishes, furniture pre-installed)
* Delivery schedule: First 3,000 units Q3 2026; full 12,000 units completed by Q4 2027
* Recyclability: 95% of materials recoverable at end-of-life

Each four-story cluster is designed for rapid desert deployment: modules arrive fully fitted, are craned onto simple strip foundations, and connected in under 72 hours per building.

Strategic Advantages That Won the Tender

* Proven desert performance - Homagic's existing 8,000-unit Phase I pilot at The Line (2024) recorded zero heat-related incidents and 41% lower energy consumption than regional benchmarks.
* CIMC-MBS technical partnership - Seamless integration of global-leading steel modular patents with CSCEC's concrete expertise.
* In-Kingdom value - Commitment to transfer 35% of manufacturing to a new Dammam facility by 2028, creating 1,200 direct Saudi jobs.
* Bankability - 50-year durability allows units to be refinanced as permanent real estate assets post-construction, reducing lifecycle cost for NEOM.

Early Site Progress and Client Statement

Foundation work has already begun at Oxagon and The Line worker city zones. NEOM Executive Director for Construction, Eng. Mohammed Al-Shehri, commented: "Homagic's Phase I performance exceeded our expectations on quality, speed, and worker welfare. Awarding Phase II to the same proven system ensures continuity while meeting our escalated sustainability targets."

Looking Ahead

The 12,000-unit contract positions Homagic as the single largest modular accommodation provider across all Vision 2030 giga-projects. The company has also been shortlisted for upcoming worker housing packages at Qiddiya (18,000 beds) and Red Sea Global (Phase III, 9,000 beds).

As Saudi Arabia pushes toward 70% in-Kingdom modular adoption by 2030, Homagic's blend of Chinese industrial scale and permanent-building certification is setting a new regional standard.

For technical specifications, case studies, and partnership inquiries, visit https://www.homagic.com/.

Media Contact
Company Name: China Construction Integrated Building Co., Ltd.
Email:Send Email [https://www.abnewswire.com/email_contact_us.php?pr=homagic-wins-phase-ii-contract-for-12000-permanent-worker-accommodation-units-at-saudi-arabias-neom]
Country: China
Website: https://www.homagic.com/

Legal Disclaimer: Information contained on this page is provided by an independent third-party content provider. ABNewswire makes no warranties or responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you are affiliated with this article or have any complaints or copyright issues related to this article and would like it to be removed, please contact retract@swscontact.com



This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release Homagic Wins Phase II Contract for 12,000 Permanent Worker Accommodation Units at Saudi Arabia's NEOM here

News-ID: 4282968 • Views:

More Releases from ABNewswire

Mineral Tiles Launches Holiday Season Promotion to Support Home Renovation Projects
Mineral Tiles Launches Holiday Season Promotion to Support Home Renovation Proje …
Leading Online Tiles Retailer Offers Significant Savings on Premium Tile Collections Miami, FL - 21 Nov, 2025 - Mineral Tiles, a pioneering online tile retailer established in 2006, announces a 10% sitewide discount for Black Friday Cyber Monday (BFCM) across its extensive collection of premium tiles and innovative surface solutions. This limited-time offer applies to the company's full range of products, including porcelain, ceramic, glass, natural stone, specialty pool tiles, and
Redway Power Launches Next-Generation Rack-Mounted Lithium Batteries for High-Performance Energy Storage
Redway Power Launches Next-Generation Rack-Mounted Lithium Batteries for High-Pe …
Redway Power Trademark , a leading OEM lithium battery [https://www.redwaypower.com/product-category/lithium-battery-modules/] manufacturer with over 13 years of experience, proudly announces the launch of its latest innovation: the next-generation rack-mounted lithium battery series, designed to deliver unmatched performance, scalability, and reliability for industrial, telecom, and commercial energy storage applications. Building on its reputation for high-quality LiFePO4 technology, Redway Power continues to redefine energy solutions by combining advanced cell chemistry, smart battery management, and
PrepCraft Launches AI-Powered Standardized Test Prep Platform That Builds Confidence in Just 15 Minutes a Day
PrepCraft Launches AI-Powered Standardized Test Prep Platform That Builds Confid …
PrepCraft, an innovative AI-powered test preparation platform, today announced its official launch to help students in grades 3-8 prepare for standardized tests with personalized, 15-minute daily practice sessions. The platform addresses the growing concern of test anxiety among elementary and middle school students by providing realistic, exam-aligned practice powered by Claude AI, with real-time progress tracking for parents. Sheridan, WY - November 21, 2025 - PrepCraft, a next-generation test preparation platform,
BNX Payments Limited Launches BNX AI: Free, Registration-Free Generative Image Platform for All Users
BNX Payments Limited Launches BNX AI: Free, Registration-Free Generative Image P …
London-based BNX Payments Limited has launched BNX AI, a free web-based generative image tool available at https://bnx.me. Users can create high-quality visuals from text prompts without registration or payment. The platform's free tier offers unrestricted commercial use, making advanced AI image generation accessible to all. London, United Kingdom - 21 November, 2025 - BNX Payments Limited, a London-based technology company, today announced the public launch of BNX AI, a web-based generative

All 5 Releases


More Releases for Homagic

Homagic to Export 50,000 MiC Units Annually Along Belt & Road by 2027
China Construction Integrated Building Co., Ltd. [https://www.homagic.com/] (CSCEC), through its Homagic [https://www.homagic.com/] brand, has unveiled an ambitious export program targeting 50,000 Modular Integrated Construction (MiC) units annually along the Belt and Road Initiative (BRI) corridors by 2027. This strategic push, leveraging CSCEC's global EPC dominance and Homagic's cutting-edge prefabrication technology, positions the company to capture a significant share of the infrastructure boom in emerging markets, where rapid, sustainable building solutions
CSCEC's Homagic Achieves Breakthrough in Zero-Carbon Modular Construction with C …
In a landmark achievement for sustainable building, Homagic, the modular construction arm of China State Construction Engineering Corporation (CSCEC), has successfully delivered China's first zero-carbon Modular integrated Construction (MiC) project. This pioneering initiative not only demonstrates the viability of carbon-neutral building at scale but also positions Homagic as a leader in the rapidly evolving prefabricated construction sector. Visit their official site at https://www.homagic.com/ [https://www.homagic.com/] for more details on this breakthrough. The
CSCEC's Homagic Achieves Breakthrough in Zero-Carbon Modular Construction with C …
In a landmark achievement for sustainable building, Homagic, the modular construction arm of China State Construction Engineering Corporation (CSCEC), has successfully delivered China's first zero-carbon Modular integrated Construction (MiC) project. This pioneering initiative not only demonstrates the viability of carbon-neutral building at scale but also positions Homagic as a leader in the rapidly evolving prefabricated construction sector. Visit their official site at https://www.homagic.com/ for more details on this breakthrough. The modular
Homagic Transforms Beijing Hutong Urban Renewal with 3-Month C-MiC Demolition-Re …
In a landmark achievement for urban revitalization, China Construction Integrated Building Co., Ltd. (CSCEC), operating under the Homagic [https://www.homagic.com/] brand, has completed the demolition and reconstruction of the historic Huapi Factory Hutong No. 8 building in just three months using its innovative Concrete Modular Integrated Construction (C-MiC) system. This project marks China's first C-MiC "demolish-and-rebuild" initiative in a densely populated urban setting, showcasing how modular technology is redefining city renewal
Homagic Transforms Beijing Hutong Urban Renewal with 3-Month C-MiC Demolition-Re …
In a landmark achievement for urban revitalization, China Construction Integrated Building Co., Ltd. (CSCEC),(https://www.homagic.com/) operating under the Homagic brand, has completed the demolition and reconstruction of the historic Huapi Factory Hutong No. 8 building in just three months using its innovative Concrete Modular Integrated Construction (C-MiC) system. This project marks China's first C-MiC "demolish-and-rebuild" initiative in a densely populated urban setting, showcasing how modular technology is redefining city renewal amid
Homagic: From Project Risk to Product Certainty - Achieving 90% Off-Site Complet …
The global construction industry is at a critical juncture. Faced with a chronic shortage of skilled labor, soaring material costs, and an urgent mandate for sustainable development, the traditional stick-built model, characterized by cost overruns and unpredictable timelines, is becoming obsolete. The necessary revolution is not incremental; it is a fundamental shift from site-based project delivery-riddled with risk-to factory-based product certainty. Image: https://www.abnewswire.com/upload/2025/10/7a834ed8e96fa59756132f05e17f4cb3.jpg This transition is being spearheaded by the industrialization of