openPR Logo
Press release

SCHEDULING IN THE 21ST CENTURY

10-11-2018 01:39 PM CET | Business, Economy, Finances, Banking & Insurance

Press release from: QUANTUM PROFIT SCIENCE

/ PR Agency: QUANTUM PROFIT SCIENCE
CATCHING UP WITH THE 21ST CENTURY BUSINESS INFORMATION REQUIREMENTS
QPS Scheduling Requires: A mature business conversation “park your ego prior to the conversation”
• Master Schedule: can’t slide it in either direction. It tells you if you are on, ahead or behind the master schedule.
• Cloud Mesh Platform
• The scheduling module and the entire QPS, offering meets the requirements for the information society, the current generation.
• Secure from outside access (each customers information is on their secure company cloud web site
• Once a Lot is issued to WIP it cannot be changed without the profit control coordinator executing the changes
• The schedule has block chain attributes, it is secured from lot issuance to Finished Goods Inventor (FGI)
• Front (forward) Back (ending) date scheduling
• QPS’s scheduling doesn’t use estimate back room standards to schedule the companywide Lean Value Add Stream (routing) it uses Time-Driven Activity-Based Profit Scheduling
• QPS’s scheduling has actualized the Theory of Constrain, Drum, Buffer, Rope
• The schedule is built around the Lego blocking concept see your demo tee up document
• The combination of Profit Model and Profit Scheduling creates AI-MI self-sustaining culture
• Read Peter Drucker’s book written in 2002 Managing in The Next Society and Bill Gates book written in 1990 Business At The Speed Of Thought. Both require current accurate data in the form of understandable routines that employees can act on real time from Tomorrows information not yesterday’s trailing fiction
• The schedule, when supported by the full complements of modules all information including big financial analytics, are for a future capital free profit engineered specification it is a full pull
• The schedule (Profit Scheduling) is created in Profit Engineering not finance. Wealth is created in operations owned by those who understand how to Plan, Schedule, Measure/Manage and Reward for total under the roof company performance including capital free profit, quality and on-time delivery
• The shop floor scheduling module can start your company to replace your present ERP system at 20% the cost and 20% of the keep up to date coasts (KUD)
• Every stakeholder in the company can see the entire schedule and their individual responsibilities real-actionable time
• Using both Julian calander and the M day colander which uses Monday through Friday leaving Saturday, Sunday and holidays for recover opportunity
• Critical Path (equipment work/centers, profit/centers) Capacity Plan (employees Applied Labor ADL)
• Phase Two the schedule includes the factory overhead employees
• Phase Three schedule includes SG&A employees and all SG&A departments “all stake holders”
• Actualizes “The Theory of Constraint”
• All stakeholders see their KPI’s real – Actionable – Time through their touch time lens with planned engineered capital free profit imbedded within the touch time.
• Warning indicator when 80% of each stakeholder’s touch time (back room standards, estimates are used up) giving warning to supervision to help. No more tail wagging the dog and surprises after the fact.
• Profit Engineering develops the work statement with capital free engineered specification profit included
• Lean Value ADD Stream replaces budgets
• Time-Driven Activity (operations) Based Profit Scheduling (see Kaplan Harvard PHD the inventor of it 1990 QPS developed it 10 years prior to him and implemented it as a shop floor system 1984
• Profit Scheduling is fixed, and sales is variable (equivalent dollars)
• Each Lot requires different equivalent dollars to produce a fixed capital free profit during the same accounting period
• QPS’s offering obsoletes the P&L and Cost of Goods COGS measures real-time capital free profit
• The scheduling system is a chart of accounts driven system not the P&L
• Eliminates accrual and all inventory adjustments it measures true real time performance with no tenuous allocations adjustments and false entries
• Ins and outs of inventory are zeroed. No forecasting ending inventory
• All financial measurements are from the build line (dollars under the roof)
• All outsourcing dollars (pass through dollars are not included in measurement only markup dollars stay under the roof (big error in GAAP accounting)
• Total time to housekeep a Lot issued to Work in Progress “WIP” less than 10 minutes.
• Lastly this cloud offering came from 55 years hands on experience for apprenticeship to President CEO of first tier supporting aerospace OEM’s to running three divisions of GE Jet Engine Group, owner operator aircraft ground support company “AGSE” a global ground support company. 10 years as a turnaround on site CEO and 10 years hands-on delivering the full QPS offering evolving now to a cloud offering

AI-MI SELF-SUSTAINING CULTURE

Connectivity is not communication, much less understanding. A central grasp of the situation with QPS (visibility systems) makes the process itself into its own message to everyone at once. Everybody knows what to do that is routine patterns on the Lean Value Stream without meetings, directives, and the process is its own prompter for improvement. Few power games, or misunderstandings, no politics, future profit picture puzzle real-time measurement owned by operations. Attacking the what not the who, and manufacturing methods not people.
QPS’s AI-MI sees dark data that can’t be seen with present business tools, presents it as routine patterns represented companywide. Profit Scheduling pulled from the enterprises future profit picture puzzle with an agreed to profit learning curve to be acted on real-time. In the context of business dark data describes something that is hidden or undigested, which is acquired through various computer network operations but not used in any manner to derive insights or for decision making. With our offering artificial intelligence, machine learning, more dark data may be seeing the light of day. With our artificial intelligence machine intelligence future and current learning data more dark data may be seeing the light of day. This information archives the purposes (for example, analytics, business relationships and monetizing.)

LEGO BLOCKING PROFIT SCHEDULING PROFIT TRACKING
4D CUBED FINITE PROFIT SCHEDULING LEGO BLOCKING
Each Lot is blocked in three Dimensions X, Y, & Z the fourth dimension is time cubed, time is measured three
ways simultaneously, touch time, takt time & profit flow days, total companywide throughput time
Measured by engineered profit specification companywide on the lean value stream a cloud mesh platform
1st Time 80% 2nd Time TACK TIME 3rd Time Safety Net to Stay On Profit Schedule Sunk Profit Slippage
1st Time 80% 20% 2nd Time TACK TIME 3rd Time Recovery of Profit Scheduling Profit Slippage No Recovery
Back Room Standard Times Alert ADL That Has Gone Rework Requires Two X's
All Operations Activities Running UDL=Unapplied D/L Theory of Constrain Buffer Scrap Requires Three X's
Lot X Y Z Three dimensional Out Of The Constraint Must Remainder of Profit Flow Day NEW SALES REQUIREMENT
Std. Time Be Resolved In Remainder of The Day Using Protect Jobs Running 1X For Lost Opportunity
Estimate
6.4 hours 1.6 Hours 20% Slippage Sixteen Hours Remaining in Profit Flow Day TOMORROW TODAY ROFIT ASSURANCE
DRUM Constraint Customer Paying For BUFFER ROPE FULL PULL
SCHEDULE WITH “M” MANUFACTURING PROFIT DAY THROUGH-PUT NOT SALES MEASURED BY COST “COGS”

LEGO LOT BLOCKING YIELD PROFIT/PRICING
FORWARD BACK FINITE MASTER SCHEDULING
CURRENT YIELD PRICING MATCHES CURRENT OPERATION PROFIT PERFORMANCE MATCHES BANK ACCOUNT


Uniform Block Sizing
Y=



Z=






X=
PROFIT ENGINEERING: Estimating Companywide Performance Matches Bank Account
X= Quantity of Widgets per Lot= S/U + R/T < S/U PARTS * REMAINING QUANITY Fit into X Based on Equivalent Dollars Lot Size Divided by Part Price Determines # of widgets
Equivalent Dollars per Widget x+y+z * Required Equivalent Rate Tailored to Each Lot/Number of Widgets = Equivalent Dollars per Widget.

Y = Smallest Constraints in Value Profit Stream (Critical Path) per Lot
Z = Equivalent Dollars Lot Value
a. Out Source Dollars (Pass Through Dollars)
b. Bid Dollars Derived by Adjusting Equivalent Sales Dollars Supported By Standard Hours (Back Room Standards) Including SG&A

Order Review Module Dual Purpose
a. Estimator Planned Profit Velocity Yield Pricing
b. Profit Control Coordinator = Order, Lot Review to Ensure Planned Profit Velocity (PPV) per the Profit Schedule in Equivalent Dollars by Lot
c. Lot Lego Blocking Creates Flow Manufacturing In Job Shops Less Bumper Cars
d. Establishing Planned Engineered Capital Free Profit Specification Full Work Capacity In Work in Progress “WIP”

For More Details Visit Here: http://qpscience.com

Address: QUANTUM PROFIT SCIENCE

Fort Collins, Colorado
80527
USA

QPS Scheduling Requires: A mature business conversation “park your ego prior to the conversation”

Address: QUANTUM PROFIT SCIENCE

Fort Collins, Colorado
80527
USA

This release was published on openPR.

Permanent link to this press release:

Copy
Please set a link in the press area of your homepage to this press release on openPR. openPR disclaims liability for any content contained in this release.

You can edit or delete your press release SCHEDULING IN THE 21ST CENTURY here

News-ID: 1294322 • Views:

More Releases from QUANTUM PROFIT SCIENCE

THE NECESSITY FOR ADEQUATE PROFIT TIED TO CUSTOMER SATISFACTION
“The achievement of adequate profit is at once a measure of the excellence of products and an absolute necessity to the maintenance of the stability and existence of a company. Viewed from a product standpoint, profit is a reward for the risk of successful product creation. Products that are not adequately acceptable to customers do not command the profits necessary for their continuation. The reverse is true for acceptable products. Wouldn’t

More Releases for Lot

Making the Work Lot Easier Intelligent Process Automation
Intelligent Process Automation is one feature of a wider shift in technology, that of Mechanization together. From autonomous cars to drones, automation helps make seemingly contemporary technologies obtainable today by creating and leveraging new procedures of intelligence. Whether it is customer communications in the form of desktop assistants or robotic tasks in an enterprise, automation is altering the way we live in our homes and work from an office. Request for
LoT Insurance Market 2025 | Detailed Report
In its recently added report by Big Market Research has provided unique insights about LoT Insurance Market for the given period. One of the main objectives of this report is to categorize the various dynamics of the market and to offer latest updates such as mergers and acquisitions, various technological developments, new entrants in the market, which make an impact on different segments. The comprehensive value chain analysis of the market
It's beginning to look a lot like Summer!
"Since opening Duplication Media in 2003, we have seen memories from Mount Rushmore over 100 times," Jason Olson, owner of Duplication Media said. The 4th of July is a time to celebrate America with your loved ones by the lake, enjoying the beautiful weather outside at BBQs, and ending the day watching fireworks with your friends and family at night while wearing red, white, and blue. The celebration doesn't stop there,
Global and Chinese M2M loT & Wearable Technology Ecosystems Global and Chinese M …
"The Report Global and Chinese M2M loT & Wearable Technology Ecosystems Industry, 2017 Market Research Report provides information on pricing, market analysis, shares, forecast, and company profiles for key industry participants. - MarketResearchReports.biz" View Report @ https://www.marketresearchreports.biz/reports/1222842/global-and-chinese-m-m-market-research-reports The 'Global and Chinese M2M loT & Wearable Technology Ecosystems Industry, 2012-2022 Market Research Report' is a professional and in-depth study on the current state of the global M2M loT & Wearable Technology Ecosystems industry
A Lot to Build for Brazilian Real Estate
The combination of a rising population and chronic housing shortage means the Brazilian real estate sector has a lot to build. 23.1 million homes are needed by 2022, an investment in Brazil that runs to R$3.2 trillion. A recent study carried out by the Fundaçao Gertulio Vargas for the Sao Paulo Federation of Industry (Fespi) calculates there’s a shortage of around 7.2 million properties in Brazil at the moment. Of the
Erasmus students do study a lot!
Long duration Spanish courses especially designed for Erasmus students Valencia. The Comunidad Valenciana is an ideal destination for students who wish to take part in the Erasmus programme. Valencia is the third biggest Spanish city to welcome Eramsus students after Madrid and Granada. Its beaches, nice weather, nightlife and cultural attractions are the main reasons why so many people choose Valencia as destination for their Erasmus. But we wonder: “Is